Field glossary · measurement
Cv
U.S. Cv lets a technician translate a measured valve pressure drop into liquid flow once the valve position and fluid specific gravity are known. A Cv of 15 passes 30 U.S. gpm of water at a 4 psi drop under the simplified turbulent-flow relation. The same coefficient gives a different flow with a heavier liquid. Check whether the published number is U.S. Cv, Imperial Cv or Kv before calculating.
The valve flow coefficient; flow equals Cv times the square root of the pressure drop in psi at a given valve position
Include specific gravity in the liquid calculation
Emerson's sixth-edition Control Valve Handbook defines Cv using water at 60°F and a 1 psi pressure drop. Its liquid-sizing equations include liquid specific gravity, piping geometry and flow-regime effects. For turbulent, nonchoked liquid flow without a piping correction, the simplified relation is Q = Cv x square root of (differential psi / SG), with Q in U.S. gpm.
Rearranging gives Cv = Q x square root of (SG / differential psi). The water-only form takes SG as one. Use the fluid's density at the operating temperature and composition when selecting that term; glycol concentration and temperature affect more than a label on the fill tank. Retain the fluid-property source with the selection.
Distinguish U.S. Cv, Imperial Cv and Kv
Spirax Sarco's conversion factors give U.S. Cv approximately 1.156 times Kv and Imperial Cv approximately 0.9627 times Kv. A Kv of 10 therefore converts to about 11.56 U.S. Cv, not 10. Preserve the original coefficient units in the submittal so a gallon-definition error remains visible during review.
Spirax Sarco also distinguishes Kvs, the fully open coefficient, from the coefficient required by an application. A valve body can have several trim capacities. Match body, trim and opening to the published data, then use the hydronic balancing guide for the measurement setup that corresponds to that valve.
Recognize where the simple square-root rule stops
Emerson's sizing method includes corrections for attached reducers, viscosity and choked liquid flow. A high differential across a hot liquid valve can reach a limit that the simple square-root relation does not represent. Preserve inlet pressure, outlet pressure, temperature and vapor-pressure data when checking that limit; differential pressure alone leaves out the absolute-pressure conditions.
Distinctions
- Valve authority
- A capacity match can still leave the selected valve with little pressure drop relative to the rest of its circuit. Check that loss allocation separately; a full-open Cv alone cannot establish control authority.
Field example
A branch needs 30 gpm at a 4 psi valve drop with liquid SG = 1.10. The simplified required Cv is 30 x square root of (1.10 / 4) = 15.73, compared with 15.00 for SG = 1.00. At fixed fluid and flow, doubling Cv reduces the calculated valve drop to one quarter.
Frequently asked questions
Can I substitute Kv directly into a U.S. gpm formula?
Convert the coefficient and confirm the pressure units first. Kv uses cubic metres per hour and a bar-based pressure reference; U.S. Cv uses U.S. gpm and psi.
Sources checked
Also defined as
- Flow in gpm that produces a 1 psi pressure drop through the valve, used to convert drop to flow