Field glossary · component

PICV

Danfoss's June 2026 datasheet rates its AB-QM 4.0 DN 15 standard-flow pressure-independent control valve (PICV) at 700 L/h. A 60% maximum setting therefore represents 420 L/h at full actuator command, with lower flow commanded as demand falls. Commission against that valve's operating differential, test-port diagram and document revision; nominal pipe size and a dial percentage do not fully identify the selected flow.

Pressure independent control valve, which holds a preset flow regardless of differential pressure within its control range

Used across 3 Anvilfield field guides, most in HVAC.
Updated

The valve generation determines the setting scale

Danfoss's June 2026 datasheet AI410444293660en-020303 lists 700 L/h nominal flow for the standard-flow DN 15 AB-QM 4.0, with a 10% to 100% setting range. At 60%, its selected maximum is 420 L/h. Record the valve code and applicable datasheet revision: an older nominal capacity or a high-flow version changes the result even when the dial percentage matches.

Write the design flow in L/h beside the dial percentage on the balancing sheet. That lets the reviewer catch the right percentage on the wrong valve. After setting maximum flow, prove closure and full command with the actuator fitted; a dial position alone does not verify actuator travel.

Minimum operating differential is not the body rating

Danfoss specifies a 16 kPa minimum operating differential and 600 kPa maximum differential for the AB-QM 4.0 DN 15 standard-flow version. Its datasheet states that at the minimum differential the valve reaches at least 90% of nominal flow. Treat that explicit performance statement as the basis, rather than assuming the threshold guarantees exact nominal flow.

The PN 25 pressure designation on that valve describes a different rating from the differential across the regulating assembly. A valve that withstands system pressure can still lack the operating differential needed to regulate. Conversely, raising pump pressure above the required control range does not increase the scheduled coil duty.

Read what the test plugs actually measure

Danfoss's January 2026 flow-checker note identifies the DN 15-32 AB-QM 4.0 test-plug measurement as p1 minus p2, the control-section differential used with the published coefficient to calculate flow. The note distinguishes this from p1 minus p3, the full-valve differential used on other arrangements. Do not reuse a full-valve minimum-pressure test interpretation on control-section ports.

Use the coefficient table for the identified valve and document revision, with its dial setting and test-port diagram. Danfoss's flow-checker note treats calculated flow within ±10% of the set flow as matching the setting. That manufacturer check is distinct from a tighter project TAB tolerance. Carry the measured result into the fan-coil commissioning record with the actuator command and system condition.

Distinctions

Automatic flow limiter
A fixed-flow limiter caps flow but need not provide a modulating control function. A PICV also responds to the load command.
Electronic pressure-independent valve
An electronic design can use a measured-flow feedback loop instead of a mechanical pressure-regulating cartridge. Identify the technology when describing test points.

Frequently asked questions

Does setting a PICV to 60% make it pass 60% flow all the time?

It establishes the selected maximum on the specified scale. A modulating actuator commands lower flow when the load requires it.

Can I calculate flow from any PICV pressure ports?

Only with the manufacturer's port definition and corresponding calculation. Full-valve and control-section differentials are different measurements.

Sources checked

Also defined as

  • Pressure independent control valve, combining control, differential-pressure regulation, and flow limiting in one body
  • Pressure independent control valve, combining control, balancing, and flow limiting in one body

Where this shows up

Next step: Track hydronic valve scopes