NPSHr

Manufacturer-published net positive suction head required (NPSHr) must be at least the tested NPSH3 under ANSI/HI 9.6.1-2024. These two curve labels can therefore carry different numbers. With 20 ft NPSHr and 28 ft NPSHa, the available margin is 8 ft, regardless of a lower NPSH3 value. Match the selected flow, speed and liquid condition before accepting that comparison.

Net positive suction head required; the suction head the pump needs at a given flow, read from the manufacturer's curve

Used across 2 Anvilfield field guides, most in HVAC.
Updated

NPSH3 marks measurable head loss, not first bubbles

The Hydraulic Institute defines NPSH3 at a 3% reduction in total head, or first-stage head for a multistage pump, caused by cavitation at constant flow. A curve marked NPSH3 therefore describes a pump that has already lost head at that condition. Matching available head exactly to that curve does not preserve the full published head.

HI's pump-curve guidance states that NPSH margin above NPSH3 is needed to achieve the published head. Read the curve legend and test basis before treating a line marked NPSH as either incipient cavitation or a service-life guarantee. A cavitation investigation should record which criterion the curve uses before comparing field head with it.

What changed in ANSI/HI 9.6.1-2024

ANSI/HI 9.6.1-2024 shifted the margin reference from NPSH3 to manufacturer-supplied NPSHr, which the Hydraulic Institute says must equal or exceed tested NPSH3. A published required-head curve can therefore include a manufacturer allowance above the test point. Preserve the curve's actual designation when moving numbers into a selection worksheet.

HI's October 2026 explanation confirms that the application-specific margin is the difference between NPSHa and NPSHr. Required margin depends on the application, operating conditions, liquid and pump characteristics. Use the published requirement and applicable margin together; replacing the requirement with an assumed 3% test value changes the comparison.

Read the two margins on a submittal

A submittal giving 28 ft NPSHa, 20 ft NPSHr and 15 ft NPSH3 supports three different comparisons. Identify the denominator or subtraction basis explicitly; a bare statement of “13 ft margin” would conceal the smaller margin above the manufacturer requirement.

Repeat that comparison at each scheduled speed and flow, including parallel operation and permitted overload. KSB notes that changes in speed, pump scale and fluid can require tested evidence for NPSH conversion. Do not apply the ordinary head affinity relationship to required NPSH without the manufacturer's supporting curve. Keep the exact model, impeller, speed and liquid identification with the replacement selection.

ComparisonCalculationResult
Margin above NPSHr28 - 20 ft8 ft
NPSHa/NPSHr ratio28 / 201.40
Head above NPSH328 - 15 ft13 ft

Distinctions

Incipient cavitation
The onset of vapor formation is a different criterion from the 3% head-drop test. Those criteria produce different required-head values.
Application margin
The additional available head specified above the published requirement. It is not a replacement for identifying the curve's cavitation criterion.

Frequently asked questions

Does NPSHa equal to NPSH3 mean the pump is safe from cavitation?

No. The NPSH3 point already represents cavitation sufficient to reduce head by 3%.

Is NPSHr always the same as NPSH3?

No. Under the 2024 HI margin guidance, manufacturer-published NPSHr is at least the tested NPSH3 and can be higher.