Field glossary · measurement
H friction
Write H friction as a head loss for a named pipe path and flow, separating straight-pipe resistance from fittings. The Hydraulic Institute's Darcy-Weisbach and K-factor equations give about 4.97 feet for the worked pipe-and-fitting calculation below. Doubling velocity raises that result fourfold only while the friction and fitting coefficients remain unchanged. In NPSHA work, losses already reflected in a suction-gauge reading must not be subtracted again.
Friction head lost in the suction piping, strainer, and valve before the pump inlet, in feet
Build the loss from straight pipe and fittings
The Hydraulic Institute formula reference gives straight-pipe friction head as f × (L/D) × v²/(2g), using inside diameter D and consistent length units. The factor f is the Darcy friction factor, L is pipe length, v is average velocity and g is gravitational acceleration.
For a valve or fitting, the Hydraulic Institute expresses head loss as K × v²/(2g), with K the component's resistance coefficient. Add the separate losses along the selected path. If the path changes diameter, calculate each section at its own velocity instead of applying one velocity to every fitting.
For a pump-cavitation investigation, identify the suction calculation's starting point before totaling these losses. A reservoir-based calculation and a suction-gauge-based calculation account for upstream resistance differently.
Applied Flow Technology's Arrow verification reference converts a Fanning factor to a Darcy-Weisbach factor by multiplying by four. Inserting a Fanning value into the Darcy-Weisbach equation above without multiplying it by four reports only one quarter of the straight-pipe loss. Name the factor convention beside f on the calculation sheet.
Calculate a pipe run before scaling its flow
For 200 feet of pipe with a 0.25-foot inside diameter, a selected Darcy factor of 0.020 and velocity of 4 ft/s, straight-pipe loss is 0.020 × (200/0.25) × 16/64.4 = 3.98 feet. Fittings totaling K = 4 add 4 × 16/64.4 = 0.99 foot. The combined friction head is about 4.97 feet.
Doubling velocity to 8 ft/s raises that result to about 19.88 feet if the friction factor and fitting coefficients remain unchanged. That is a fourfold increase, not a doubling. Recalculate the friction factor when the operating regime or fluid properties change.
KSB's centrifugal-pump lexicon states that pipe friction factor is independent of roughness in laminar flow below Reynolds number 2,320. In that regime the factor changes with Reynolds number, so a fixed-factor square-law extrapolation is inappropriate. Fluid viscosity belongs in the calculation, especially for glycol mixtures and cold starts.
Do not subtract suction losses twice
A calculation beginning at the supply reservoir must account for the friction between that reservoir and the pump. A calculation beginning with measured pressure at the suction gauge already includes the effect of upstream losses on that pressure. Subtracting the same upstream loss again understates the head available at the pump.
Hydraulic Institute's gauge-based NPSHA equation uses atmospheric head, measured suction gauge head, suction velocity head, gauge elevation relative to the datum and vapor-pressure head. It does not add another subtraction for the pipe losses already reflected in the gauge reading.
For troubleshooting, separate the clean-pipe estimate from measured component losses. A fouled strainer changes the installed resistance without changing the pipe length on the drawing. Compare its pressure drop at the relevant flow and convert that drop to fluid head before adding it to the path total.
Distinctions
- Static head
- The elevation or pressure contribution that remains independent of friction through the selected path; it does not follow the same flow-dependent calculation.
Frequently asked questions
Should discharge friction be subtracted from NPSHA?
Not in a suction-side available-head calculation. Discharge resistance affects the system duty point, but the suction calculation includes the path and conditions before the pump.
Can a valve be counted as both equivalent length and K?
Use one representation for the same component. Adding both its equivalent-length loss and its K-based loss counts that resistance twice.
Sources checked
Also defined as
- Plumbing: Friction head in feet, the loss through pipe, fittings, and the check valve at the design flow