Field glossary · measurement
Drawdown
Drawdown needs a unit and a defined start and end condition. In a well it is the fall from static to pumping water level, measured as depth. In a pressure tank it is usable water released between switch pressures, measured as volume. In stormwater work it often refers to a water-level decline over elapsed time. These meanings support different calculations and are not interchangeable pump capacities.
The drop from static to pumping level; also the gallons a tank delivers between cut-out and cut-in
Well drawdown supports a specific-capacity calculation
Penn State Extension defines well specific capacity as pumping rate in gallons per minute divided by drawdown in feet after 24 hours or at equilibrium. State the rate and test duration with the result so a short early reading is not compared directly with a stabilized test.
A static depth of 40 feet and pumping depth of 70 feet below the same reference point produce 30 feet of drawdown. At 9 gpm, specific capacity is 9 / 30 = 0.30 gpm per foot. The pumping depth is 70 feet; it is not the drawdown. The well-pump guide carries the water levels into system selection.
Tank volume exceeds the water delivered per cycle
Amtrol’s August 2025 Well-X-Trol brochure assigns the same 20 gallon WX-202 different delivered volumes at different switch settings. At 40/60 psi it delivers 5.4 gallons, or 27 percent of shell volume. The model schedule below keeps the pressure pair with each drawdown value.
At a steady 5 gpm fixture demand, 5.4 gallons lasts about 65 seconds while pressure falls from cut-out to cut-in and the pump remains off. Refill time is a different calculation because the operating pump must supply fixtures and restore tank storage at the same time.
Amtrol’s July 2025 setup example pairs a 40/60 switch with a 38 psig air charge, demonstrating the specified 2 psi offset below cut-in. Adjustments are made with the water drained, the system off and the tank at ambient temperature. A corroded or damaged pressure vessel must not be repressurized. This setup differs from the cold-supply-pressure match used for domestic thermal-expansion tanks.
| WX-202 switch setting | Published drawdown |
|---|---|
| 30/50 psi | 6.2 gallons |
| 40/60 psi | 5.4 gallons |
| 50/70 psi | 4.7 gallons |
A basin pump removes inflow as well as stored water
For a basin with 24 gallons between the off and on levels, a 30 gpm pump and 10 gpm continuing inflow give 20 gpm net removal. Drawdown takes 24 / 20 = 1.2 minutes, or 72 seconds. Dividing by pump capacity alone would incorrectly predict 48 seconds.
Record the on/off elevations, working volume, measured pump discharge and inflow condition together. The sump and ejector guide explains why those values determine cycling rather than the basin’s total nominal volume.
Stormwater observations need a clock origin
A pond’s decline after inflow ends is a time record. State the last inflow, starting water level, later levels and the elevation reference. “Dry by Thursday” cannot establish elapsed drawdown without the ending time of the runoff event. The bioretention guide explains the design-dependent drainage endpoint used for that practice.
Distinctions
- Well yield
- A pumping rate supported by the well. Drawdown is the associated water-level change under that rate and duration.
- Total tank volume
- The entire vessel capacity, including the air space. The useful delivered water depends on the pressure operating range.
Frequently asked questions
Does a 20 gallon pressure tank supply 20 gallons per cycle?
No. The cited WX-202 delivers 5.4 gallons over its 40/60 psi cycle, with the specified precharge conditions.
Is drawdown the same as pumping water depth?
Pumping depth is the measured level while pumping. Subtract static depth measured from the same point to obtain drawdown.
Sources checked
Also defined as
- Concrete: The amount the groundwater level is lowered, measured from the original water table to the pumped level
- Landscaping: Time for the ponded water to soak away after a storm, commonly 24 to 48 hours