Forebay

A forebay is the accessible pretreatment cell ahead of a larger stormwater practice. Its storage, outlet elevation, and cleanout surface are designed to concentrate coarse sediment where machinery can remove it. Judge capacity from the approved forebay section and its sediment marker. The main pond's water level or total volume does not reveal how much pretreatment storage remains.

A small settling pool at the inlet that catches coarse sediment before it spreads across the basin, making cleanout easier

Used across 2 Anvilfield field guides, most in Landscaping.
Updated

Size pretreatment against the water-quality volume

The Connecticut Stormwater Quality Manual recommends forebay storage equal to 10% to 25% of the water-quality volume below the forebay outlet invert, unless its practice-specific chapter sets another criterion. Its sizing analysis excludes infiltration. That basis prevents an assumed soil loss from reducing the storage needed to settle incoming sediment.

For a 12,000-cubic-foot water-quality volume, that recommendation yields 1,200 to 3,000 cubic feet of forebay storage. EPA's dry-pond fact sheet separately describes a forebay sized to about 10% of the treatment volume. Keep the selected manual and percentage beside the calculation; percentages from different design references are not interchangeable approvals.

Design the bottom for the machine that cleans it

Connecticut recommends a concrete or grouted-stone bottom and advises against loose riprap inside the forebay because it makes sediment removal difficult. The cleanout operator needs to distinguish the original bottom from deposited material without pulling out the erosion protection on every pass.

Connecticut recommends a stage indicator marked at the full-sediment level. Photograph the readable scale with each depth observation and retain the cleanout reading as the next inspection's baseline. Label water-level marks separately: a mark indicating normal pond water cannot tell the operator how much sediment storage remains.

Read depth loss before choosing a cleanout date

Connecticut calls for measuring accumulated forebay sediment twice a year and removing it when depth exceeds 12 inches or 50% of design depth. In a forebay with 18 inches of design depth, the half-depth criterion is 9 inches, so the crew should not wait for a full foot of sediment.

The same manual calls for cleaning the forebay outlet when drawdown exceeds 36 hours after a storm ends. Sediment depth and outlet blockage are separate service triggers. Tie both to the pond inspection record and distinguish pretreatment for a bioretention cell from the storage in the main facility.

Distinctions

Micropool
A small permanent water pool can serve outlet protection or treatment. Position and approved function establish whether it is also a forebay.
Main basin sediment allowance
The larger facility has its own sediment-storage and cleanout criteria. A full forebay does not establish that the main basin has lost the same percentage of volume.

Pond contractors expanding a cleanout route use PorchRocket Asset Search to locate stormwater ponds from aerial imagery, with the owner of record included on each reviewed find.

Frequently asked questions

Can several inlets share a forebay?

Connecticut allows multiple inflows to one forebay. The layout must bring those flows through the intended settling area rather than short-circuiting directly to the main practice.

Sources checked

Also defined as

  • A small pretreatment pool that drops sediment before it reaches the media

Where this shows up

Next step: Monitor stormwater site changes

Back to the full field glossary