Retention

In stormwater work, retention describes runoff kept out of surface discharge, while EPA also uses wet retention pond for a treatment basin with a permanent pool. SFWMD's 2024 handbook requires its dry retention areas to recover storage within 72 hours. On a wet-pond survey, subtract the standing-pool volume from the approved upper-stage volume to find available storm capacity. Those two uses of retention produce different inspection endpoints.

Storage terminology that varies by jurisdiction; identify whether the approved facility retains a permanent pool

Used across 2 Anvilfield field guides, most in Landscaping.
Updated

Dry retention has a measurable recovery deadline

Florida's Environmental Resource Permit Applicant's Handbook Volume I, effective June 28, 2024, defines retention around preventing a specified runoff volume from discharging to surface waters through complete storage on site. SFWMD Volume II, section 5.2.1, requires a retention basin to have no standing water after drawdown, making infiltration recovery a field acceptance question rather than a permanent-pool inspection.

SFWMD's June 2024 Volume II, section 5.2.3(a), requires dry retention and detention areas to recover their retained or detained volume within 72 hours. The section excludes natural and mitigation wetland areas. This is a regional criterion with an identifiable facility scope, not a description of how every pond should look three days after rain.

A field log for that facility needs the storm-end time, observed water elevations and the recovery endpoint. The pond management guide provides the inspection framework; the permit's design volume supplies the quantity whose recovery is being checked.

A permanent pool already occupies storage

EPA's December 2021 Wet Ponds fact sheet includes wet retention ponds among basins holding a permanent pool throughout the year or wet season. For a pond with 18,000 cubic feet below normal pool, that standing inventory is already occupied before the next storm. The capacity calculation below therefore starts with the volume at normal pool.

EPA's February 2009 Stormwater Wet Pond and Wetland Management Guidebook places the normal permanent pool at or near the low-flow orifice or weir elevation. Compare the surveyed water surface with that control before reporting surplus storage. A low pool, an elevated pool and a pond designed to empty are three different observations.

Translate an elevated pool into lost storm capacity

Read the approved stage-storage table at the normal pool, the observed water level and the emergency spillway crest. Using the volumes below, the intended storage band is 24,000 - 18,000 = 6,000 cubic feet. At the observed level it has only 3,600 cubic feet available, so 40 percent of that band is occupied.

Use the stage-storage table rather than multiplying the visible surface area by depth on a basin with sloping banks. Photograph the gauge reading and outlet condition together. The resulting quantity makes the observation useful to the owner and gives the maintenance scope a defined defect instead of a vague report that the pond looks full.

Water levelCumulative stored volumeSpace remaining below spillway crest
Normal pool18,000 cubic feet6,000 cubic feet
Observed elevated pool20,400 cubic feet3,600 cubic feet
Emergency spillway crest24,000 cubic feet0 cubic feet

Distinctions

Detention
SFWMD Volume II separates infiltration-based retention from detention that releases treatment water to surface waters. A basin with a restricted surface outlet can detain runoff without retaining that same volume under Florida's definition. Identify the receiving path on the outlet detail before classifying the facility.
Video retention
In the CCTV design guide, retention is the time recorded footage remains available. Its unit is time; it does not describe stormwater storage.
Contract retention
Payment retention means retainage, the amount withheld under a construction agreement. Keep that commercial use separate from the facility classification on a pond maintenance bid.

Frequently asked questions

Does retained water always stay in the basin permanently?

No. SFWMD's section 5.2.1 requires an empty basin after a dry-retention system has completed drawdown. EPA's wet-pond category carries a permanent treatment pool, so its water-level log tracks departures from normal pool rather than progress toward an empty basin.

Sources checked

Also defined as

  • Electrical: How many days of footage the system keeps, commonly 30, 60, or 90; usually set by spec, insurer, or local rule, and it multiplies the storage

Where this shows up