Field glossary
Retention pond
A stormwater pond with a permanent pool that adds water-quality treatment to peak flow control.
Where this shows up
The source for a site list related to retention pond is PorchRocket's Asset Search, which returns visible stormwater ponds and basins with the owner of record on every find.