Detention

Detention is temporary storage that changes the timing and peak rate of runoff discharge. Its useful quantity is the storage available above the normal water level, linked to an outlet that releases water as the level changes. A basin, underground chamber, or roof can provide detention. Footprint alone does not establish capacity, and discharge rate alone does not establish how much storage a storm requires.

Temporary storage and controlled release of runoff to meet the approved design objectives

Used across 2 Anvilfield field guides, most in Landscaping.
Updated

Separate stored volume from release rate

Volume uses cubic feet; flow uses cubic feet per second. During any interval, the change in storage equals inflow volume minus outflow volume. A facility receiving 3 cubic feet per second and releasing 1 cubic foot per second for ten minutes gains 1,200 cubic feet of stored water. The same rates sustained for twenty minutes require twice that storage.

A 6,000-square-foot basin with an average usable storage depth of 0.75 foot provides 4,500 cubic feet. That volume comparison is an accounting check. Actual routing uses changing inflow and outlet rates, the surveyed stage-storage relationship, and downstream water levels. A single peak number leaves out the duration that creates the storage demand.

What extended detention adds to the timing

EPA's 2021 dry-detention guidance describes treatment-volume release over 12 to 48 hours. Connecticut's 2023 Stormwater Quality Manual gives 24 to 48 hours as the typical interval for a dry basin to empty between storms. Both references describe a timed release, rather than a requirement that every depression lose all visible water immediately.

Connecticut's 2023 manual does not accept dry extended detention for either the retention or treatment criterion in its Standard 1. Sediment settling and delayed discharge do not establish that local compliance credit has been earned. Keep the hydraulic benefit, the measured pollutant performance, and the credited permit objective separate when comparing alternatives.

Find the active storage on the section drawing

On a wet pond, the permanent pool below the normal outlet elevation already contains water before the storm. Detention occupies the designated space above that level. On a roof, trays, drains, and structural limits define the usable storage. Subtracting the wrong starting level overstates capacity before any outlet becomes blocked.

Compare the operating elevations in the pond management guide with the roof-specific load and drainage questions in the blue roof guide. The same storage arithmetic applies, while the components and permitted water levels differ.

Distinctions

Retention
Retention addresses water kept from immediate downstream discharge through infiltration, reuse, or other specified pathways. Local manuals define the credited volume.
Detention time
A time measurement must name its basis, such as drawdown of a specified treatment volume. It is not interchangeable with total storm duration.

Frequently asked questions

Does a larger outlet improve detention?

A larger opening generally changes the stage-discharge relationship and releases water faster. Restoring the approved opening preserves the design; enlarging it changes the hydraulic function.

Sources checked

Also defined as

  • Roofing: Holding stormwater temporarily and releasing it slowly, the intent of a blue roof, versus retention which keeps it