WQv

WQv, or water quality volume, is a runoff-treatment target; New York's 2024 standard method calculates it as P x (0.05 + 0.009I) x A / 12 acre-feet. P is design rainfall in inches, I is impervious percentage and A is contributing acres. Entering 0.60 instead of 60 for a 60-percent-impervious site understates the result by roughly 91 percent. Keep this treatment volume separate from peak discharge and from the volume credited to runoff reduction.

Water quality volume, the runoff the basin is sized to capture and treat, set by the local manual and permit

Used across 2 Anvilfield field guides, most in Landscaping.
Updated

What New York's 2024 WQv equation measures

New York's Stormwater Management Design Manual, issued July 31, 2024, uses the 90th-percentile, 24-hour rainfall event for its standard WQv calculation. A five-acre site can therefore have both a small-storm treatment target and separate larger-storm storage and release criteria. The stormwater pond guide covers those broader facility duties.

New York's 2024 manual requires a minimum rainfall depth P of 1.0 inch for this standard WQv calculation, even where its rainfall map indicates less. Section 4.2 calculates WQv in acre-feet as P x Rv x A / 12, with P in inches, A in contributing acres and Rv as the volumetric runoff coefficient.

The New York equation sets Rv = 0.05 + 0.009I, where I is impervious cover expressed as a percentage, not a decimal fraction. Enter 60 for 60 percent impervious cover. The manual has a separate enhanced-phosphorus-removal calculation using the 1-year, 24-hour storm, so identify the applicable section on the calculation sheet.

Five acres at 60 percent impervious cover

Take a contributing area of 5.0 acres, 60 percent impervious cover and P = 1.0 inch. The runoff coefficient is 0.05 + 0.009 x 60 = 0.59. WQv is then 1.0 x 0.59 x 5.0 / 12 = 0.24583 acre-foot. Multiplying by 43,560 converts that result to approximately 10,709 cubic feet.

Entering 0.60 instead of 60 produces Rv = 0.0554 and about 1,006 cubic feet, understating the volume by roughly 91 percent. The spreadsheet still returns a plausible-looking positive number. Label the impervious input with a percent sign and retain the measured impervious area behind it.

Pavement additions change the result even when the property boundary stays fixed. Raising impervious cover from 60 to 70 percent on those same five acres increases Rv to 0.68 and WQv to 12,342 cubic feet, an increase of about 1,634 cubic feet. Record the contributing area as well as the impervious percentage when comparing old and revised plans.

Count available water storage, not excavation volume

EPA's November 2023 Bioretention Design Handbook notes that some states require 100 percent of WQv in surface storage and give no credit for storage in the media. For a 2,000-square-foot cell with vertical sides, 6 inches of available surface ponding holds 1,000 cubic feet. Use surveyed stage-area geometry for sloping sides instead of treating the top footprint as a vertical box.

Separate gross excavation from water-storage space. Media and aggregate occupy part of the below-surface excavation, and their void volume belongs in the accounting only when the approved method credits it. EPA's surface-storage example explains why adding excavation volume to ponding volume can overstate the cell's credited capacity.

Measure the current bed-to-overflow separation against the approved section. An extra 2 inches of mulch across the same 2,000-square-foot vertical-sided cell consumes about 333 cubic feet, one-third of its 1,000-cubic-foot surface capacity. Carry that lost-storage quantity into the maintenance scope in the bioretention guide.

New York runoff reduction has its own compliance test

Section 4.4 of New York's 2024 manual sets runoff reduction of 100 percent of post-development WQv as the default requirement. Groundwater recharge, infiltration, reuse and evapotranspiration are reduction pathways. A pond that treats the water and then discharges it has not, by that fact alone, supplied the same volume of reduction.

Where site limitations prevent full reduction, the manual requires those limitations to be identified in the stormwater pollution prevention plan and still requires the minimum RRv for newly constructed impervious area. Chapter 3, steps 4 and 5, then assigns the unreduced WQv to acceptable treatment practices after that minimum is met. Keep required WQv, achieved RRv and remaining treatment volume as separate calculation lines.

Distinctions

Peak discharge
Peak discharge is a rate, commonly in cubic feet per second, while WQv is a total runoff volume. Dividing a storage volume by a chosen time gives an average rate; it does not establish the event's peak discharge or replace the outlet-routing calculation.

Sources checked

Where this shows up

Next step: Find pond maintenance owners