ANVILFIELD Try FieldOS

Field glossary · method

PoE

PoE means Power over Ethernet, but a switch's advertised watts and a camera's usable watts are different quantities. A 30 W IEEE 802.3at port provides a 25.5 W device-side power allowance after channel loss. Diagnose a limited camera by reading its requested class, assigned class and port status, then compare its full operating demand with the assigned allowance. Counting Ethernet ports alone does not establish the switch's power capacity.

Power over Ethernet; power and data on one cable, in classes af (about 15.4 W), at (30 W), and bt (60 to 90 W), to 100 m

Used across 2 Anvilfield field guides, most in Electrical.
Updated

How many PoE watts reach the camera?

Texas Instruments' TIDUEL2 reference guide separates power sourced by the PSE from power available at the PD: its Class 4 profile pairs 30 W at the source with 25.5 W at the device. The source-side number belongs in the switch budget; the device-side number belongs beside the endpoint's maximum input demand.

TI's IEEE 802.3bt profiles assign Class 6 a 60 W source allowance and 51 W at the device, while Class 8 pairs 90 W with 71.3 W. These are power profiles, not promises that every port on a switch supports the highest class. A 28 W endpoint input exceeds a Class 4 device allowance even though 28 is less than the port's advertised 30.

TI's TIDUEU3 camera design guide describes PoE cabling up to 100 m. A 90 m route plus 12 m of patch leads totals 102 m, exceeding that length before any power allocation is considered. Record the complete connected channel in the cable-test report, including the leads at both ends.

Common designation and top profilePSE powerPD power allowancePowered pairs at this profile
802.3af, Type 1, Class 315.4 WAbout 13 W2
802.3at, Type 2, Class 430 W25.5 W2
802.3bt, Type 3, Class 660 W51 W4
802.3bt, Type 4, Class 890 W71.3 W4

Detection happens before the operating voltage arrives

Texas Instruments' TIDA-010083 design guide describes PoE detection using a low test voltage between 2.7 and 10.1 volts to identify the PD's signature resistance. The port is looking for an electrical signature, not reading the camera's model number. Successful Ethernet communication alone therefore does not establish that the power negotiation succeeded.

TI also distinguishes this process from passive injectors that connect a supply without detection. Identify the injector's operating method before substituting it for a switch port. A matching connector and a familiar voltage label do not establish the same behavior at connection, disconnection or a fault. The low-voltage cabling guide addresses the installation around that equipment.

Requested class and assigned class answer different questions

The May 2025 TI TPS23881B datasheet gives an example in which a Class 8 PD requests Class 8 but receives Class 6 from a port limited to that allocation. The controller reports both values. That difference is power demotion, not proof of excessive cable resistance.

Read the PD's requested class beside the PSE's assigned class and power status. A lower assignment sends the investigation toward port configuration and available allocation. An adequate assignment followed by shutdown under load raises a different question about delivery or load behavior. Compare those events with the voltage-drop and bundle-heat checks instead of using one voltage reading to explain every failed startup.

Budget the allocation across all active ports

Twelve ports reserving 30 W each require 360 W of PSE budget. A switch with 370 W available to PoE has 10 W left under that allocation; subtracting twelve device-side allowances of 25.5 W would instead show 64 W and overstate the remaining source budget. Keep both calculations on the same side of the cable.

Record each endpoint's required class, the port's supported class, the allocation policy and the switch's available PoE budget. Class-based reservation and measured-power allocation need different budget worksheets. The TPS23881B controller's eight-channel count describes its internal hardware, while the finished switch's port configuration and power supply establish what the installer can allocate.

Distinctions

Type versus class
Type describes PoE equipment capabilities; class identifies a power profile within those capabilities. The af, at and bt suffixes identify IEEE amendments, not numeric power classes.
PoE versus POE oil
PoE here names an Ethernet power method. The capitalized POE abbreviation in refrigeration guides refers to lubricant and does not describe network cabling.

Frequently asked questions

Why does the camera lose its heater or illuminator while data still works?

Compare the camera's requested and assigned classes with its full operating demand. A lower assigned class can support a reduced feature set; the TI Class 8-to-Class 6 demotion example shows that negotiation can impose the limit before cable loss is investigated.

Sources checked

Also defined as

  • Power over Ethernet, delivering device power over the data cable per IEEE 802.3

Where this shows up

Related guides

Next step: Build your commercial territory

Back to the full field glossary