ANVILFIELD Try FieldOS

Field glossary · process

Heave

Heave is upward movement of soil or the construction it supports; classify it by mechanism and elevation history before translating laboratory swell into inches. A 3-foot layer swelling 2% contributes 0.72 inch of calculated rise. ASTM D4546-25 ties wetting-induced movement to specimen condition, applied load, and inundation sequence. Frost-induced ice lenses and hydraulic uplift need different evidence from an expansive-soil swell result.

Upward movement from soil swelling, usually expansive clay taking on moisture, the opposite of settlement

Used across 2 Anvilfield field guides, most in Concrete.
Updated

Choose a swell test that represents the ground

ASTM D4546-25 Method A tests reconstituted specimens representing compacted fill, while Method B tests intact samples from natural soil or existing fill. Both methods measure wetting-induced swell or collapse. Keep the movement's sign on the layer calculation: a collapsing layer contributes settlement even when adjacent layers swell.

Why the load at wetting changes predicted heave

ASTM D4546-25 Method B selects the pressure at wetting to match the in-place overburden stress plus structural stress at the sampling depth. A soil's measured swell is therefore tied to the applied pressure. Read that pressure alongside the strain rather than comparing percentages from differently loaded specimens as if they were interchangeable material constants.

Build the movement estimate layer by layer. Retain sample depth, layer thickness, initial moisture condition, applied stress, and measured vertical strain. ASTM D4546-25 specifically identifies density, water content, and the order of loading and wetting as factors that substantially change results. The investigation should preserve those inputs instead of reducing the soil profile to one swell percentage.

Use one layer schedule to connect the laboratory samples, borehole depths, and foundation loads, then attach the dated building-elevation survey. This makes a proposed underpinning scope traceable to both the moving layer and the observed building movement.

Frost screening looks below ordinary sieve sizes

FHWA's Geotechnical Aspects of Pavements identifies inorganic soils with more than 3% by weight finer than 0.02 mm as presenting a possible frost hazard. That fraction is finer than the 0.075 mm opening of the No. 200 sieve. A gradation reporting only the No. 200 passing percentage does not establish the amount finer than 0.02 mm.

FHWA identifies three conditions for frost heave: frost-susceptible soil, freezing temperatures in that soil, and a water supply. Add temperature and water-source observations to the gradation result. An ice-lens investigation and a wetting-induced clay-swell test answer different questions even when both sites show seasonal uplift.

Distinctions

Swell strain
Vertical change divided by the sample's starting height under the stated test conditions. It becomes a contribution to ground movement when applied to the represented layer thickness.
Swell pressure
The pressure associated with preventing wetting-induced swell. It is a stress quantity, not an upward displacement in inches or millimeters.

Field example

A 3-foot soil layer assigned 2% vertical swell contributes 0.72 inch to the calculated rise: 36 inches times 0.02. A second 2-foot layer assigned 1% contributes 0.24 inch, for a combined 0.96 inch. Use strains measured under the loads and wetting conditions assigned to each layer; the arithmetic does not make those inputs interchangeable.

Frequently asked questions

Does a single floor-level survey prove heave?

It establishes the shape at the survey date. Repeated elevations tied to a stable reference establish movement through time. A high center alone cannot distinguish a rising center from dropping edges without that history and the soil evidence.

Sources checked

Also defined as

  • Upward movement of the excavation bottom from seepage or from artesian pressure under the floor

Where this shows up

Related guides

Next step: Build a grounds territory

Back to the full field glossary