Field glossary · measurement
H static
A pump worksheet can correctly use 6 ft of static suction head and 30 ft of system elevation head for the same installation: source water at elevation 100 ft, pump centerline at 94 ft, and receiving water at 130 ft. H static therefore needs named endpoints and a sign convention. KSB defines the static portion of system head as flow-independent; vessel pressure differences add to the elevation contribution even when the liquid levels match.
Static height of water above the pump suction in feet; positive on a flooded suction, negative on a suction lift
Locate the datum in the equation
Xylem's Goulds Water Technology pump-fundamentals manual defines static suction head as the vertical distance from the pump centerline upward to the source liquid's free surface. It defines static suction lift as the vertical distance downward from that centerline to a source surface below the pump. In an equation using signed suction head, the first is positive and the second is negative.
The same Xylem manual measures static discharge head from the pump centerline to the free-discharge point. A system calculation combines the suction and discharge sides; a suction-only calculation does not. Mark both endpoints on the sketch instead of copying a number labeled static head from a different worksheet.
KSB distinguishes the flow-independent static portion of system head from the flow-dependent dynamic portion. Its geodetic head is outlet elevation minus inlet elevation. A pressure difference between vessels adds a separate static contribution, even when their liquid levels are equal.
One pump, two valid static-head values
A vented source has its liquid surface at elevation 100 ft, a pump centerline at 94 ft, and an open receiving surface at 130 ft. Static suction head is positive 6 ft. The elevation contribution to total system static head is 30 ft. Using 30 ft in the suction term would assign the pump pressure that does not exist at its inlet.
Lowering the pump centerline to elevation 90 ft increases static suction head to 10 ft while leaving the source-to-destination elevation difference at 30 ft. This is why lowering a pump can improve its suction conditions without reducing the elevation head required to transfer water between those reservoirs.
A falling source level changes both calculations. If the source drops from elevation 100 ft to 96 ft with the original pump position unchanged, suction head falls from 6 ft to 2 ft and system elevation head rises from 30 ft to 34 ft. Record the minimum operating level as well as the level observed during the test.
Convert pressure only after identifying the liquid
Xylem gives pressure head in feet of liquid as 2.31 times pressure in psi divided by specific gravity. A 10 psi pressure contribution is therefore 23.1 ft for a liquid with specific gravity 1.00 and 28.9 ft at specific gravity 0.80. The pressure is unchanged; the equivalent liquid-column height changes.
A surveyed 10 ft elevation difference remains 10 ft of geometric head regardless of the liquid. Specific gravity enters when converting that head to pressure or converting a vessel pressure into head. Keeping geometric and pressure terms separate avoids applying the density correction to the elevation twice.
The NPSH diagnosis guide uses suction conditions to examine cavitation. The sump-pump sizing guide uses the full discharge path to size duty. Retain the symbol's meaning from the calculation being performed.
Distinctions
- Friction head
- When the example's source level falls from 100 ft to 96 ft, system elevation head increases by 4 ft before friction is calculated. Recalculate friction at the resulting flow; adding the elevation change does not establish the flowing pipe loss.
- NPSH available
- Lowering the example's pump from elevation 94 ft to 90 ft adds 4 ft to its static suction contribution. To determine the resulting NPSH available, retain source absolute pressure, liquid vapor pressure, and suction losses in the same calculation.
Frequently asked questions
Do equal liquid levels mean zero system static head?
Only when the surface pressures are equal as well. Using Xylem's conversion, a receiving vessel held 10 psi above the source adds 23.1 ft of static pressure head for water at specific gravity 1.00, even with both liquid surfaces at the same elevation.
Sources checked
Also defined as
- Plumbing: Static lift in feet, the vertical rise from the pump-off water level to the high point of the discharge