Field glossary · measurement
Head
A pressure reading of 50 psi represents 115.5 ft of head for water at SG 1.00, or 144.4 ft for a liquid at SG 0.80, using the Hydraulic Institute conversion. Head expresses energy per unit weight, so fluid density belongs beside every pressure conversion. For pump measurements, add the tap-height and velocity corrections before comparing that head with a manufacturer's curve.
Pressure expressed as the height of a water column; 10 ft of head is about 4.3 psi at the bottom
Convert pressure for the liquid in the pipe
The Hydraulic Institute gives the U.S. pressure-head conversion as H = 2.31 × p / SG, with H in feet, p in psi and SG the liquid's specific gravity. Thus 100 ft of head corresponds to about 43.3 psi for water at SG 1.00, but only 34.6 psi for a liquid at SG 0.80. The head is unchanged; the pressure is not.
Use the fluid properties at operating temperature when converting a glycol, fuel or process-liquid pressure. Specific gravity is a density ratio, not a viscosity correction. Two liquids with similar density can still give different friction losses and pump efficiency because their viscosities differ. A water-only pressure conversion does not describe that second effect.
The table applies the Hydraulic Institute formula to the same pressure differences in two liquids. Values are rounded to one decimal place; use the selected fluid's operating-temperature specific gravity for the job calculation.
| Pressure difference (psi) | Head at SG 1.00 (ft) | Head at SG 0.80 (ft) |
|---|---|---|
| 30 | 69.3 | 86.6 |
| 50 | 115.5 | 144.4 |
Recover the head between two measuring points
Hydraulic Institute's system-curves tutorial requires elevation and velocity corrections when pressure measurements represent locations with different heights or pipe diameters. Subtracting the gauges alone is sufficient only when those extra terms cancel or are negligible.
Take water readings of 18 psig at the inlet and 48 psig at the outlet, with equal pipe velocities and the outlet tap 3 ft higher. The pressure contribution is 30 × 2.31 = 69.3 ft; adding the elevation difference gives 72.3 ft. The added 3 ft is not a friction allowance. It accounts for where the pressure was measured.
For a suction gauge reading -4 psig, the Hydraulic Institute conversion gives -9.24 ft of pressure head at SG 1.00. Retain the negative sign in the subtraction. Replacing that value with positive 9.24 ft understates the pressure difference across the pump by 18.48 ft.
Read a pump selection as a pair of coordinates
Taco's Water Circulation guidance identifies the crossing of pump performance and system resistance curves as the operating point. A head value without its flow says too little: shutoff head, operating head and the head at maximum plotted flow are different coordinates.
A well-pump selection needs the liquid, speed, impeller or stage selection, flow and head recorded together. That makes a later pressure reading usable as a performance comparison instead of an isolated number.
Distinctions
- Static head
- Static head is the part arising from elevation and boundary pressure. It remains when flow-dependent friction disappears.
- Head pressure in refrigeration
- Technicians also use head pressure for compressor discharge or condensing pressure. That usage normally refers to a refrigerant pressure, not a length on a water-pump curve.
Frequently asked questions
Does a pump advertised for 100 ft of head deliver that head at every flow?
No. Read the curve at the required flow and stated speed. A maximum-head advertisement commonly describes the low-flow end of the curve.
Sources checked
Also defined as
- Landscaping: The vertical lift plus friction a pump must overcome, in feet; flow drops as head rises
- Pressure expressed as feet of water; about 2.31 ft equals 1 psi