Field glossary · component
DWV
DWV is the drain, waste, and vent service designation used on plumbing drawings and product markings. For PVC purchasing, the decisive distinction is drainage-only construction versus pressure-rated construction: ASTM F891 cellular-core pipe is nonpressure pipe even when its dimensions are Schedule 40. Read the material standard and fitting identification together before substituting a length from another inventory bin.
Drain, waste, and vent, the gravity piping that carries waste out and lets the system breathe
What the lettering on PVC actually establishes
ASTM D2665-25 covers PVC drain, waste, and vent pipe and fittings, including dimensional, stiffness, impact, and material requirements. Its published scope identifies drainage products; passing a manufacturing test does not assign a working-pressure rating to a completed installation.
Charlotte Pipe distinguishes solid-wall PVC DWV made to ASTM D2665 from cellular-core PVC made to ASTM F891. ASTM F891-24 expressly limits cellular-core PVC to nonpressure applications. The foam-containing wall can look like ordinary white PVC from outside, so read the print line instead of identifying it by color.
ASTM D1785-26 covers Schedule 40, 80, and 120 PVC pressure pipe and includes sustained-pressure and burst requirements. Charlotte Pipe notes that some solid-wall pipe carries both D1785 and D2665 markings. That dual marking belongs to the pipe; it does not upgrade the drainage fittings attached to it.
Why Schedule 40 is an incomplete purchase description
A purchase order for white Schedule 40 pipe leaves out the service. Two lengths with matching outside dimensions can have different wall construction and permitted uses. Specify the material standard, pressure or drainage service, and joining system, then verify those markings when the shipment arrives.
Keep the fitting carton or molded identification with the submittal. A pressure-rated straight length connected through a DWV pattern fitting still contains a component selected for drainage. A successful leak test demonstrates the tested condition; it does not reclassify the product.
At receiving, compare the print line on the straight pipe with the standard molded into the fittings. Charlotte Pipe identifies dual-marked solid-wall pipe separately from cellular-core pipe; a supplier description that says only PVC DWV does not resolve that difference. Photograph both markings on a mixed shipment so the material record identifies the assembly actually installed.
Keep the service boundary visible on the drawing
Show where a pumped waste discharge becomes gravity drainage, and identify the transition components. A pump connected somewhere upstream does not make every downstream branch a force main. Conversely, labeling a pumped segment sanitary waste does not make drainage-only fittings suitable for its operating pressure.
The plumbing inspection guide covers inspection stages, while the hydrostatic testing guide addresses test arrangements. The additional question at material review is which service each marked component was manufactured to perform.
Distinctions
- Force main
- A force main carries pumped wastewater under pressure. DWV describes the drainage and venting application, including gravity piping downstream of a pumped discharge.
Sources checked
Also defined as
- Drain-waste-vent, the gravity sanitary and vent piping, tested watertight and gastight