Field glossary · measurement

psi / psig

At a local atmospheric pressure of 12.2 psia, a 40 psig reading means 52.2 psia. The U.S. Department of Energy's compressed-air sourcebook includes barometric pressure in that conversion. Psig identifies a pressure relative to nearby air, while psi alone supplies the unit without identifying its zero. Preserve the reference when converting to kPa and use pressure above vacuum for gas-volume calculations.

Pounds per square inch; psig is gauge pressure above atmospheric, which is what the test gauge reads

Used across 2 Anvilfield field guides, most in Plumbing.
Updated

Keep the reference when converting units

NIST SP 811 gives one pound-force per square inch as approximately 6,894.757 pascals. Thus 100 psig is 689.476 kPa gauge, not 689.476 kPa absolute. Converting the unit does not change the zero reference.

NIST lists a standard atmosphere as 101,325 pascals, equivalent to about 14.696 psi. That is a defined reference atmosphere, not a promise that the jobsite's barometric pressure equals it. Elevation and weather change the atmospheric pressure to add to a gauge reading.

The U.S. Department of Energy's compressed-air sourcebook says barometric pressure must be accounted for when obtaining absolute pressure from gauge pressure. At a measured local atmosphere of 12.2 psia, a 40 psig reading represents 52.2 psia. Adding the sea-level shorthand of 14.7 would overstate it by 2.5 psi.

Gas ratios require pressure above vacuum

At a local atmosphere of 14.7 psia, raising a sealed gas from 40 to 60 psig changes its absolute pressure from 54.7 to 74.7 psia. The ratio is 74.7 divided by 54.7, about 1.366, not 60 divided by 40, or 1.5. Use absolute temperature as well when calculating a temperature-dependent gas volume.

A negative gauge reading is possible. At that same atmosphere, -5 psig corresponds to 9.7 psia, still above a vacuum. This is why a pump suction gauge reading cannot be compared directly with an absolute vapor-pressure value. Keep the reference beside both numbers before subtracting them.

Make the pressure-test record unambiguous

Write the pressure basis on the gauge identification and test sheet, together with the range and units. Carry that reference through the hydrostatic-test record when converting an equipment specification from psi to kPa.

A pressure difference needs no atmospheric correction when both gauge readings share the same local reference: 80 psig minus 65 psig is a 15 psi difference. Converting each to absolute pressure would add the same number twice and cancel it again. The resulting difference is commonly labeled psid.

Keep pressure reference separate from instrument accuracy. A correctly labeled gauge can still have zero error, an unsuitable range or a damaged sensing element. Recording 'psig' identifies the measurement basis; it does not certify the instrument.

Distinctions

psia
Absolute pressure measured above a vacuum, used for gas laws and vapor-pressure comparisons.
psid
The difference between two pressures; it describes a subtraction, not a reference to the room atmosphere.

Frequently asked questions

Is psi always gauge pressure on a plumbing drawing?

Gauge pressure is common in building-water work, but psi by itself does not specify the reference. Preserve the drawing legend or equipment specification’s stated basis in the test record.