Field glossary · measurement
psid
Psid expresses a pressure difference independently of the line's operating pressure. Watts' TK-9A measures 0 to 15 psid while its complete-kit working-pressure limit is 175 psi; the 600 psi rating of its ball valves does not raise that limit. Select both the differential range and the permitted line pressure. A zero differential can exist with both ports pressurized, so it cannot establish that the system is depressurized.
Pounds per square inch differential, the pressure difference the gauge reads across a check or the relief
A small dial range can sit on a high-pressure line
Watts specifies a 0 to 15 psid measurement range for the TK-9A backflow test kit. Watts separately limits that kit to 175 psi working pressure and 210°F. A 5 psid indication therefore says nothing by itself about whether the connected supply is within the kit's pressure rating.
Watts' TK-9A specification also lists 600 psi ratings for individual ball valves. That component rating does not raise the assembled kit's 175 psi maximum. Read the rating for the complete instrument, hoses and fittings being used rather than selecting the largest number on the sheet.
WIKA's differential-pressure training separates differential range, static line pressure and one-sided overpressure. Static line pressure loads both ports; one-sided overpressure occurs when the two sides are exposed unequally. A gauge can tolerate a high pressure on both sides yet be damaged by that same pressure on only one port.
Two ordinary gauges can hide a small differential
Suppose two 0 to 200 psig gauges each have an accuracy limit of 1 percent of full scale, or ±2 psi. Subtracting their readings can carry a worst-case error of ±4 psi. A reported 3 psi loss is then smaller than the combined error limit. These are the assumed gauges' specifications, not a rating for the TK-9A.
A purpose-built differential instrument puts the small difference on its own scale. Its certificate still needs to cover the values actually used for acceptance. Keep the serial number, calibration results and range with the backflow test record; a calibration sticker without the relevant measurement data does not explain a marginal result.
The pressure path includes the hoses
Connect the high and low sides to the identified test points and purge trapped gas according to the instrument and assembly procedure. In a static, completely water-filled hose, pressure head depends on endpoint elevations, not the height of an intermediate loop. Raising a hose bend alone adds no net head. Air pockets, leaking connections and restrictions during a flowing test require separate diagnosis.
Using the Hydraulic Institute's water-head conversion, pressure taps 2.31 ft apart vertically introduce a 1 psi hydrostatic difference into the tap-to-tap pressures. A water-filled differential hookup whose two gauge ports are at the same elevation offsets that elevation contribution through its hose columns. Record tap and gauge-port elevations before comparing the instrument indication with two local gauge readings.
Write the sign and the tap locations with any pressure-drop measurement. '3 psid across the strainer' should mean inlet pressure minus outlet pressure at a stated flow. A reversed hookup can display a negative value or drive a mechanical indicator against its stop.
Use the assembly-specific field-test procedure to decide which differential represents the component under test. The instrument's unit cannot tell you whether the reading belongs to a check valve, relief opening point or trapped intermediate zone.
Distinctions
- psig
- Pressure relative to atmosphere. Two psig readings can be subtracted, but their measurement errors remain in the result.
- Pressure-drop rating
- A component’s resistance at a specified flow; psid is the unit used to express that result.
Frequently asked questions
Does zero psid mean the pipe is depressurized?
No. Both ports could be at the same high pressure. Zero differential says the measured pressures are equal, not that either side is at atmospheric pressure.