Field glossary · component
DC / DCVA
A DCVA, or double check valve assembly, is a listed and field-testable backflow unit for non-health-hazard connections. Watts limits its LF007 application to hazards accepted in that category by the local authority; a 175 psi working-pressure rating does not expand the hazard approval. Identify both check modules, shutoffs and test points, then match the model’s size and orientation approval. A dual-check device is a different product category.
Double check valve assembly, two checks in series for low-hazard protection (ASSE 1015)
Count the assembly components and read the listing
ASSE 1015-2021 describes a double check assembly with two independently acting, force-loaded checks, two tightly closing shutoff valves and properly located test cocks. It covers intermittent and continuous pressure service. An improvised pair of inline check valves does not establish compliance with that product standard.
ASSE 1024-2023 is the separate standard for dual-check devices, while ASSE 1015-2021 covers the testable assembly described here. Watts’ LF007 specification restricts use to connections the local authority identifies as non-health hazards. Put that hazard determination beside the standard and model on the assembly-selection record.
Temperature and pressure ratings belong to the model
Watts’ ES-LF007S specification covers 1/2 through 2 inch assemblies, with a 175 psi maximum working pressure and a 33°F to 180°F service range. Those size-specific operating limits do not supply the differential-pressure acceptance criterion for an individual check.
The same Watts specification describes four top-mounted test cocks and two resilient-seated isolation valves in the complete assembly. Count the installed valves and test points against the supplied configuration. A replacement body sold without shutoffs needs the rest of the approved arrangement established; its compact appearance does not make those components unnecessary.
Orientation approval does not transfer between products
Watts lists horizontal and vertical flow-up approval for the sizes covered by the cited LF007S specification. Vertical flow-up is a named orientation, not permission to install the assembly vertically with flow downward. Preserve the flow arrow and approval information in an installation photo.
A cramped retrofit that rotates an assembly to clear a wall changes the relationship between flow direction and the approval. Confirm the particular size, option and orientation as one combination before the replacement is ordered. Do not transfer this LF007 statement to a different DCVA model.
Keep service-pressure loss separate from check testing
EPA’s Cross-Connection Control Manual gives a minimum 1 psid reading for each DCVA check in its differential-gauge field test. Readings of 1.4 and 0.8 psid therefore leave the second check below that criterion; adding them to report 2.2 psid would conceal the failure. Keep each result with its check number and the procedure used.
Pressure loss at service flow answers a separate sizing question and comes from the model’s flow curve. Neither a passing check test nor acceptable static inlet pressure establishes adequate downstream pressure at design flow. The backflow test guide supplies the procedure context; the service calculation needs flow and inlet/outlet pressures.
Distinctions
- DCDA
- A double check detector assembly includes a metered bypass for detecting small flows, with its own assembly category and testing scope.
- RP assembly
- Adds a relief-valve-controlled intermediate zone. A DCVA’s working-pressure rating does not make it suitable for an RP-required health hazard.
Frequently asked questions
Does 175 psi mean the check must hold a 175 psi differential?
No. That is the cited model’s maximum working pressure. Field check tests use their own differential criteria and procedure.
Can any double check assembly be installed vertically?
Watts’ cited ES-LF007S sheet lists horizontal and vertical flow-up approval for its 1/2 through 2 inch models. Other sizes, configurations and flow-down installations require their own approval record.
Sources checked
Also defined as
- Double check valve assembly; two checks, for low hazard and both flow directions