Field glossary · safety
Degree of hazard
Degree of hazard is the backflow hazard rating recorded for a water service or connection. California's April 2026 handbook requires a finding of high hazard, low hazard or no hazard, distinguishing threats to water safety from purely aesthetic impairment. It also requires assessing whether existing protection suits that rating. A passing assembly test cannot supply the hazard assessment: Washington requires the hazard rating and test history as separate records.
Whether backflow would threaten health (high hazard) or only quality such as taste and odor (low hazard)
What evidence supports a hazard classification?
EPA's Cross-Connection Control Manual, February 2003 edition, recommends asking about process-water use, boiler and cooling-tower treatment chemicals, and secondary supplies such as wells. Its survey method calls for requesting as-built drawings, tracing potable lines and documenting findings with sketches or photographs. These are investigation methods; the water supplier's applicable rules establish the required protection.
Build a record for each connection: drawing location, process served, material that could enter the water, chemical feed or auxiliary supply, and evidence supporting the classification. Photograph the feed tubing and its destination, not just the backflow assembly's serial plate. An untreated-water pipe label becomes unreliable after a chemical feed is added. Use the cross-connection control guide to identify the flow mechanism, then attach the material evidence to that same connection.
When high hazard requires more than a service RP
Washington's WAC 246-290-490(4)(b)(ii) requires premises posing a severe health hazard, including wastewater treatment plants, to use an approved service air gap or an RPBA/RPDA combined with an approved in-plant air gap. Radioactive material processing plants and nuclear reactors are also named in that provision. A service RP by itself does not satisfy that Washington requirement.
For that Washington arrangement, carry the service RP assembly and the in-plant air gap as separate scope items, each located on the survey drawing. A quote covering only the service assembly leaves the required in-plant protection unaccounted for. Pair the assembly selection guide with the recorded severe-hazard finding when preparing the scope.
Reassess after account and process changes
California's Cross-Connection Control Policy Handbook, amended April 21, 2026, requires community water systems to reassess after an account-holder change other than at a single-family residence, a new or restored service connection, evidence of changed activities or materials, or a backflow incident. Section 3.2.1(e) also requires reassessment at the interval in the system's control plan, at the State Water Board's request, or when the system concludes that the earlier assessment may be inaccurate.
The single-family exception concerns account-holder changes; it does not exempt a residence from reassessment after a backflow incident or evidence of changed materials. Section 3.2.1(h) requires a cross-connection control specialist to conduct or review each assessment and make a written finding on the hazards, their classification and corresponding protection. Keep that finding with the dated process description so a later survey can identify what changed.
Two water services can mean two protection allowances
A California premises has two connections to the public water system, neither serving fire protection. The hazard assessment requires RP protection at the service supplying a process. Appendix D's multiple-connection note makes that the minimum protection level for both services, excluding fire protection. The office-wing service therefore also needs at least RP-level protection. Record two protected services in the takeoff; a separate office meter does not remove the shared-premises requirement.
Distinctions
- Assembly test result
- WAC 246-290-490(3)(j)(ii)(B) requires the assessed hazard level and assembly test history as separate record fields. Use the survey finding to establish required protection and the test report to establish the installed assembly's performance. An assembly can pass its test while remaining the wrong type for the recorded hazard.
Frequently asked questions
Does low hazard mean there is no cross-connection?
No. Seattle Public Utilities retains low hazard as a cross-connection category for aesthetic water-quality impairment. California's Section 3.2.1(b) separately permits a no-hazard finding, and Section 3.2.1(c) still requires an adequacy decision on existing protection. Do not merge low hazard and no hazard into one survey checkbox.
Can denied survey access be recorded as no hazard?
California's handbook Appendix D lists denied or restricted hazard-assessment access among high-hazard premises. Lack of access does not support a no-hazard finding.
Sources checked
- EPA: Cross-Connection Control Manual, EPA 816-R-03-002, February 2003, survey guidance
- Washington WAC 246-290-490: assessed hazard records and severe-health-hazard protection
- California State Water Resources Control Board: Cross-Connection Control Policy Handbook, amended April 21, 2026, Section 3.2.1 (pages 19-20) and Appendix D (pages D-1 to D-2)
- Seattle Public Utilities: cross-connection references and health-hazard definitions