Field glossary · component
RP / RPZ
An RP/RPZ backflow assembly has a relief outlet that must remain exposed to air as well as two check valves. Watts' LF909 instructions prohibit a direct sewer connection and require an air gap for its drain connection. The LF909's 175 psi service rating and 140°F continuous temperature limit belong to the standard model; its HW version permits 210°F. Select the discharge route and exact model together, rather than treating drainage as an accessory.
Reduced pressure principle assembly; two checks plus a relief valve, for high hazard and both flow directions
The relief opening changes the installation
ASSE 1013-2021 covers reduced-pressure assemblies protecting against both backpressure and backsiphonage. The standard's scope describes two independently acting checks with a differential relief valve between them, together with shutoffs and test cocks. A pair of ordinary check valves lacks that controlled relief arrangement.
Watts' LF909 installation instructions prohibit a direct sewer connection from the relief opening and require an air gap for a drain connection. Submergence removes the intended atmospheric separation. A floor drain somewhere in the room is not enough information to establish whether the actual discharge route works.
Record the relief opening's location relative to the receptor, the receptor's capacity and where overflow goes. Use the manufacturer's relief-discharge data for the installed size and inlet condition. The assembly's rated service flow and its possible relief discharge describe different conditions.
Monitoring does not substitute for the drain
Watts states that the LF909 flood sensor remains passive until an add-on connection kit activates communication. A sensor clipped to the relief valve therefore does not establish that anyone will receive an alarm. The specification also excludes vertical installations from the sensor's intended use because orientation affects detection.
Commission the reporting path as a separate function from the backflow test. Identify where the alert is received, which staff respond and what water-control action the facility has arranged. Include the drainage and monitoring details with the documented cross-connection hazard in the equipment handover.
Select the complete assembly for its service conditions
Watts rates the standard LF909 for 175 psi maximum working pressure and 33 to 140°F continuous service. The LF909HW hot-water version extends the listed temperature range to 210°F while retaining the 175 psi maximum. A temperature rating from the HW model cannot be assigned to the standard assembly because the bodies look alike.
Check the listing for the proposed mounting direction and exact size. Installation flexibility in a product family does not establish that every size, orientation and approval combination is the same. Keep the model suffix in the asset record, especially when ordering check modules or replacing a complete assembly.
Record the retest and relief-path inspection together
Watts calls for testing the LF909 at least annually and retesting after maintenance. Preserve both the component test results and the inspection of relief access and drainage; a successful differential test does not reveal that a later room alteration has blocked the discharge route.
Distinctions
- Double-check assembly
- Has two checks but lacks the intermediate atmospheric relief function that distinguishes an RP assembly.
- Pressure-reducing valve
- Controls delivery pressure; its similar initials do not identify a backflow protection assembly.
Frequently asked questions
Does a dripping relief valve prove that the whole assembly has failed?
No. The discharge can reflect a check problem or a pressure disturbance. Follow the assembly’s diagnostic test sequence and preserve the opening’s function while identifying the cause.
Sources checked
Also defined as
- Reduced pressure principle assembly, the high-hazard unit with two checks and a relief valve (ASSE 1013)