Field glossary · measurement
Air gap
For a plumbing air gap, measure vertically from the receptor’s overflow rim to the lowest edge of the discharge opening. A 1 1/2 inch effective indirect-waste opening needs 3 inches of separation under New York’s 2025 Section 802.3.1. Supply outlets use a different table that also accounts for nearby walls. Identify the supply or waste application before assigning a minimum; the basin’s standing water is not the measurement datum.
Open vertical space between the waste pipe outlet and the receptor flood rim, commonly 2x the pipe diameter with about a 1 in minimum
Supply gaps and waste gaps use separate rules
The 2025 Plumbing Code of New York State, Section 802.3.1, sets the indirect-waste gap at twice the effective opening of the discharge pipe. That subsection does not add a blanket 1 inch minimum. A supply-side minimum or an equipment instruction must not be silently substituted for the drainage provision.
EPA’s Cross-Connection Control Manual, technical corrections 2003, describes a water-supply air gap of at least twice the effective outlet diameter and never less than 1 inch. Its supply protection discussion belongs with tank fills and faucets. The indirect-waste guide explains the receptor arrangements to which the separate drainage measurement applies.
Why a nearby wall increases the supply dimension
For a supply outlet with an effective opening no larger than 3/4 inch serving the listed sink or laundry-tray applications, New York’s 2025 Table 608.16.1 specifies 1 1/2 inches away from a wall and 2 1/2 inches close to a wall. The table’s wall-location criteria determine the column; spout height alone is insufficient.
Table 608.16.1’s footnote uses the distance from the nearest inside edge of the spout opening: the away-from-wall column requires more than three opening diameters to one wall, or more than four diameters to two intersecting walls. For a 3/4 inch opening beside one wall, the horizontal distance must exceed 2 1/4 inches to use that column. Photograph that horizontal measurement along with the vertical gap.
Measure the opening that actually discharges
With a 1 1/2 inch effective waste opening, the cited two-diameter drainage rule produces a 3 inch gap. If the receptor rim is at elevation 24 inches, the lowest outlet edge must reach at least elevation 27 inches under that rule. Raising a grate inside the basin does not raise the flood rim.
Splash control belongs in receptor selection and discharge placement. Extending the drain down into the basin to quiet it changes the protective geometry. After equipment is rolled into position, photograph the ruler against both reference points. The cross-connection guide covers the hydraulic reason physical separation protects the supply.
Distinctions
- Air break
- Discharges below the receptor rim but above its trap seal. It lacks the above-rim separation that defines an air gap.
- Ventilation clearance
- An air space around a motor, roof assembly or hot flue serves a different purpose and is not a plumbing backflow dimension.
Frequently asked questions
Is every air gap a minimum of 1 inch?
The cited EPA supply guidance includes that minimum; the cited New York indirect-waste subsection states twice the effective opening. Apply the provision for the actual connection and its equipment requirements.
Can I measure from the water in the floor sink?
Use the flood-level rim. Normal standing water is below the overflow elevation and gives a misleading measurement.
Sources checked
Also defined as
- The vertical open space between a supply outlet and a fixture's flood rim that stops backflow at the fixture
- A physical open vertical space, at least twice the pipe diameter, between the supply and a receiving vessel