Field glossary · component

Flushometer

A flushometer controls a supply-driven toilet or urinal flush, with its internal metering parts selected for the fixture’s flush volume. Sloan lists Royal 111 variants at 1.1, 1.28, and 1.6 gallons per flush, so the family name alone is not a parts specification. Record the full model, fixture marking, and pressure during operation before deciding that a weak or continuous flush needs a diaphragm.

A flush valve that meters a measured flush to a water closet or urinal directly from the pressurized supply, with no tank

Used across 2 Anvilfield field guides, most in Plumbing.
Updated

Which numbers belong on the service order?

Sloan’s Royal 111 selection page offers 1.1, 1.28, and 1.6 gpf variants. Gallons per flush describes the metered discharge, not gallons per minute of supply capacity. A matching cover shape does not identify which metering assembly is inside.

Sloan’s specification for Royal 111-1.28-CP-TP-LL lists a valve operating range of 15 to 80 psi flowing pressure and notes that a fixture can require a higher minimum. A static gauge reading with every fixture idle does not establish the available pressure during a flush.

When low pressure looks like a valve stuck open

Sloan’s Royal troubleshooting guide identifies insufficient line pressure as a cause of continuous operation and directs the technician to close the control stop until pressure returns. That finding is different from a short, weak flush: the hydraulic closing action itself lacks the pressure it needs.

Observe the gauge while the affected valve and nearby fixtures operate. Record whether neighboring fixtures fail together and whether the symptom appears during peak demand. That separates pressure lost during simultaneous use from a fault confined to one valve body.

Separate the bypass fault from the cover fault

Sloan’s Royal guide identifies a dirty upper filter-ring bypass as another cause of a long or continuous flush and calls for removing and washing the filter rings. The same guide specifies replacement of a damaged inside cover with part A-71. These are distinct fault paths within the listed Royal assembly, not instructions to substitute that part into another flushometer family.

Lay out removed parts in their assembled order and preserve the model identification before placing a service order. Record the component found damaged or obstructed, the installed replacement designation, and the resulting cycle. “Rebuilt valve” leaves the next technician unable to distinguish a parts mismatch from a returning supply problem.

Non-hold-open describes the handle behavior

Sloan’s Royal 111 specification, revised October 23, 2026, identifies a non-hold-open handle intended to prevent extending the flush by holding the handle down. It does not promise that an obstructed bypass or damaged internal component cannot keep water flowing.

During handover, watch both the handle return and the end of water delivery. A handle that returns normally can coexist with a closing fault; the bypass and inside-cover checks above identify different reasons for that result.

The flush-valve comparison explains operating types, and the fixture efficiency guide covers water use. Keep the repair record specific enough to connect those design choices to the installed valve.

Frequently asked questions

Will holding the handle down fix a weak flush?

A non-hold-open valve is designed to prevent that extra discharge. Diagnose supply performance and fixture-to-valve compatibility instead of making handle duration the operating method.

Sources checked

Also defined as

  • The valve that flushes a fixture directly off the pressurized supply line, with no tank; also called a flush valve.