Field glossary · code or standard
WaterSense
A WaterSense product label documents independent certification against EPA's water-efficiency and performance criteria for a specific model and required accessory combination. The certifier's name beneath the mark and a matching EPA product-directory listing identify what was approved. A manufacturer's partner logo establishes program affiliation without certifying its whole catalog. Separate WaterSense systems cover homes and irrigation-professional certification programs.
The EPA efficiency label for irrigation controllers verified to save water, and the gate for most utility rebates
How to verify a WaterSense product label
EPA's WaterSense Product Certification System, Version 2.1 (January 31, 2016), assigns certification to accredited, EPA-licensed third-party bodies. The certifier's identity appears beneath the product label. Search EPA's product directory by brand and full model number, then match the result to the ordered item. Save the listing with the submittal, including any model suffix and separately supplied accessory.
Reading a weather-controller test report
Under EPA's WaterSense weather-based controller specification, Version 1.1 (September 2, 2021), each test zone needs at least 80 percent irrigation adequacy and no more than 10 percent irrigation excess; excess averaged across all six zones must not exceed 5 percent.
A report with excess scores of 8, 8, 4, 4, 4 and 4 percent fails EPA's average criterion: 32/6 = 5.33 percent, despite every zone passing the individual excess limit. Averaging also cannot rescue a zone with 79 percent adequacy, because EPA applies the 80 percent minimum separately to each zone.
EPA scores the first qualifying 30 consecutive days meeting the protocol's weather conditions. These are scheduling scores, not percentages of water saved. Catch-can distribution uniformity describes spatial coverage and is a separate measurement.
What belongs in an irrigation retrofit submittal
EPA's Version 1.1 weather-based specification and Version 1.0 soil-moisture specification both restrict an add-on or plug-in device's WaterSense label to use with a base controller on its documented compatibility list. Their labeling rules do not award the compatible base timer its own product label.
Identify the base timer, add-on device and required sensors separately in the equipment schedule. A timer substitution needs a new compatibility match, even when the device still connects electrically. Weather-based packages must retain the components used for certification; signal-based packages include instructions for obtaining the proper weather signal. Keep that configuration attached to the controller programming record and smart irrigation commissioning record.
What the soil-moisture precision score measures
EPA's soil-moisture controller specification, Version 1.0 (effective February 11, 2021), tests irrigation switching at 20, 40 and 60 percent water depletion. EPA limits the mean of six relative average deviations (RADs), one for each enable/disable and depletion-level combination, to 10 percent. Each RAD compares three replicate devices' switching readings, expressed as a percentage of full scale. This is a repeatability criterion, not a claim of soil-moisture accuracy within 10 percentage points.
EPA's freeze-recovery test places the sensor mechanism in the 40 percent depletion test medium in a freezer for three days. Each tested device must enable and disable irrigation after thawing to the pre-freeze medium temperature.
Private-lavatory faucet limits and the flow test
EPA's High-Efficiency Lavatory Faucet Specification, Version 1.0 (October 1, 2007), sets two flowing-pressure criteria: no more than 1.5 gpm at 60 psi inlet pressure and at least 0.8 gpm at 20 psi. A faucet or replacement aerator needs both efficiency and usable flow to qualify.
At 20 psi flowing inlet pressure, collecting 1 gallon in 90 seconds gives 60/90 = 0.67 gpm, below EPA's minimum. Use timed collection to diagnose a low-flow complaint and record the inlet pressure while the faucet runs. Static pressure with the faucet closed does not establish the test condition. Verify the labeled aerator model when replacing an accessory; a lower-flow public-restroom aerator does not establish private-lavatory eligibility. The plumbing fixture guide covers the broader fixture schedule.
As of November 5, 2026, EPA's faucet specification page lists Version 1.0 as final. Its proposed Version 2.0 maximum of 1.2 gpm remains a draft, with development paused since February 2025.
Distinctions
- WaterSense at Work
- EPA's commercial and institutional best-management-practice collection covers cooling towers, leak detection and other water uses. Citing that guidance establishes the operating reference; it does not certify the equipment under WaterSense's separate product-labeling system.
- Professional certification
- EPA labels qualifying irrigation certification programs; the organization administering each program certifies the professional. A labeled product and a professional's certification document establish different qualifications.
Frequently asked questions
Can a public restroom faucet carry the WaterSense label?
EPA's Version 1.0 faucet specification excludes public-use lavatory faucets, kitchen faucets and metering faucets. A hotel guest-room lavatory is private-use; the lobby restroom is public-use. Classify the fixture by who uses it, rather than by whether the building is commercial.
Does a soil moisture sensor alone qualify?
EPA's Version 1.0 covers the sensor mechanism together with its interface device, supplied as a stand-alone controller system or an add-on or plug-in device. A probe sold without an interface is outside scope, as are agricultural-only systems and on-demand controls that initiate and terminate watering at separate moisture thresholds.
Sources checked
- EPA: The WaterSense Label, eligible categories, product marks and professional programs
- EPA: WaterSense Product Certification System, Version 2.1, January 31, 2016, sections 1 and 7
- EPA: WaterSense Product Search, model listings
- EPA: WaterSense Specification for Weather-Based Irrigation Controllers, Version 1.1, September 2, 2021, sections 3 and 5 and Appendix B
- EPA: WaterSense Specification for Soil Moisture-Based Irrigation Controllers, Version 1.0, effective February 11, 2021, sections 1, 2 and 4 and Appendix B
- EPA: High-Efficiency Lavatory Faucet Specification, Version 1.0, October 1, 2007, sections 1, 2 and 7
- EPA: Bathroom Faucets, final specification and paused Version 2.0 development, checked November 5, 2026
- EPA: WaterSense at Work best management practices, commercial and institutional guidance
- EPA: Certification Systems, current Product Certification System Version 2.1
- EPA: Weather-Based Irrigation Controllers, current Version 1.1 specification
- EPA: Soil Moisture-Based Irrigation Controllers, current final specification
Also defined as
- Plumbing: The voluntary EPA label for fixtures certified to use at least 20 percent less water than the federal maximum while performing