ANVILFIELD Try FieldOS

Field glossary · method

Hydrozone

A hydrozone is a mapped planting area assigned a common water-demand basis and compatible irrigation treatment. Its identity belongs to the plants and site conditions, while a valve station identifies hardware. Keeping an area identifier, measured square footage, plant factor, and valve relationship together makes a water budget recoverable when planting changes or controllers are replaced.

A group of plants with similar water needs placed together so one irrigation schedule suits them all

Used across 5 Anvilfield field guides, most in Landscaping.
Updated

Build a hydrozone table that survives a controller change

Caltrans directs its irrigation projects to follow the applicable local ordinance when one is required. On its statewide MWELO path where no local ordinance exists, Caltrans lists a Hydrozone Information Table, maximum applied water allowance, estimated total water use, controller schedule, and pressure-loss calculations as minimum documentation. Keep the governing ordinance with the table so later revisions use the same compliance basis.

Give the planting area a stable identifier independent of its station number. HZ-03 can remain the south shrub bed after valve 7 becomes valve 12 in a controller replacement. Record the area boundary, plant palette, selected demand factor, exposure, and irrigation method so the next operator can reconstruct the design intent.

Weight water demand by area

A 1,000-square-foot area assigned a plant factor of 0.30 contributes 300 factor-weighted square feet. Another 1,000 square feet at 0.80 contributes 800. The total is 1,100 across 2,000 square feet, equivalent to an area-weighted factor of 0.55. Averaging plant names or counting shrubs does not reproduce this calculation.

The 0.55 average describes the combined water budget; it does not make the two planting areas compatible with one valve schedule. Preserve separate demand groups in the area-to-valve map. A turf enlargement changes the area weighting, while a nozzle change alters application rate. Each requires a different update to the record.

Distinguish a design budget from today's runtime

EPA's WaterSense Water Budget Tool Version 2.0 uses local climate data and zone-level design entries to compare estimated landscape water use. It provides year-round information rather than only a peak-month comparison. That makes it useful for comparing planting and irrigation designs over a common weather basis.

EPA explicitly states that its Water Budget Tool is not an irrigation-scheduling tool and directs scheduling toward local real-time weather. Use the design calculation to compare alternatives, then use current demand and measured application performance to set operating time. Retain the palette from the plant selection guide as an input and the operating minutes from the controller guide as a separate result.

Distinctions

Valve zone
A physical circuit controlled by a valve. One hydrozone can require several circuits to respect available flow and pressure.
Plant factor
A demand assumption used in the water calculation. It does not identify the nozzle application rate or the measured uniformity of a valve zone.

Frequently asked questions

Does every hydrozone need its own controller?

Several hydrozones can share a controller with separate stations and schedules. Preserve the area-to-valve relationship so changing one program does not erase the distinctions in the design water budget.

Sources checked

Also defined as

  • A group of plants sharing water need, sun, and application rate, scheduled together as one zone
  • A group of plants with the same water need on one irrigation zone, watered to a single demand

Where this shows up

Next step: Build irrigation audit lists

Back to the full field glossary