ANVILFIELD Try FieldOS

Field glossary · measurement

Precipitation rate (PR)

Precipitation rate (PR) expresses irrigation depth per hour for a specified nozzle, pressure, arc and layout. Rain Bird's equilateral triangular spacing applies about 15.5 percent more depth than square spacing at the same head separation, arc and discharge. Use the catalog's spacing geometry when comparing nozzle rates, then measure the installed zone with catch containers. Matching gallons per minute alone misses differences in arc and area served.

Application depth in inches per hour, measured by catch can or calculated by the 96.25 formula

Used across 2 Anvilfield field guides, most in Landscaping.
Updated

Why square and triangular spacing give different rates

Rain Bird's technical formulas assign an equilateral triangular layout 0.866 times the area per sprinkler of a square layout with the same head spacing. The smaller area receives the same discharge, so its calculated application rate is about 15.5 percent higher. That geometry explains the two precipitation columns on many nozzle charts.

Using Rain Bird's rounded conversion factor of 96.3, a full-circle sprinkler delivering 2.0 GPM on 30-foot square spacing applies 96.3 x 2.0 / 900 = 0.214 inch per hour. On equilateral triangular spacing, the denominator becomes 900 x 0.866 = 779.4 square feet, producing 0.247 inch per hour. These are layout calculations, not two different nozzle flow ratings.

Use the area represented by the repeated spacing pattern. Substituting a single head's circular wetted area into a chart calculation discards the overlap that the chart assumes. The irrigation audit guide covers zone measurements; this geometry check explains discrepancies between those measurements and a catalog column.

Normalize the sprinkler arc before comparing nozzles

Rain Bird's square and triangular formulas normalize discharge by multiplying nozzle GPM by 360 divided by the sprinkler arc in degrees. A 90-degree nozzle therefore uses a factor of four, while a 180-degree nozzle uses two. Comparing their raw GPM without those factors can make unequal application rates appear matched.

Normalize each nozzle to a full-circle equivalent before comparing rates. At the same radius and spacing, the first two selections below each represent 2.0 GPM at full circle; the third selection represents 4.0 GPM and applies twice their depth per hour. The arc factors come from Rain Bird's technical formulas.

Rain Bird also gives a separate single-row formula using an effective strip width of 0.8 times the sprinkler diameter. A single-row planting strip is therefore another calculation case, not the square-spacing column with one row removed.

Sprinkler arcActual nozzle flowFull-circle equivalent
90 degrees0.5 GPM0.5 x 360 / 90 = 2.0 GPM
180 degrees1.0 GPM1.0 x 360 / 180 = 2.0 GPM
90 degrees1.0 GPM1.0 x 360 / 90 = 4.0 GPM

Keep collection timing precise enough to trust the result

Utah State Extension's performance test records the time needed to collect a readable depth, so use actual elapsed minutes rather than the controller's nominal setting. An average catch of 0.10 inch over nine minutes equals 0.667 inch per hour; entering ten minutes reports 0.600 inch per hour, 10 percent low. With a timed stopwatch and a shallow catch, a one-minute transcription error can outweigh the difference between conversion constants.

Retain the measured depth and elapsed minutes with the reported rate. Round the final controller input only after completing the calculation. The controller programming guide uses that input to convert demand into minutes, while the hydrozone identifies which plants receive those minutes.

Distinctions

Precipitation rate versus distribution uniformity
PR describes application speed; distribution uniformity describes how evenly that application is shared. Utah State's catch-container method preserves both the average and the spread of readings. Two zones with the same average PR can require different repairs when one has widely scattered catches.

Frequently asked questions

Why do references use either 96.25 or 96.3?

Rain Bird rounds the flow-to-depth conversion factor to 96.3. Compared with 96.25, that changes the result by about 0.052 percent. Spacing, arc and collection timing usually explain a much larger disagreement than this rounding difference.

Sources checked

Also defined as

  • The depth a zone applies per hour, in inches per hour, the divisor in the run-time formula

Where this shows up

Next step: Find grounds accounts

Back to the full field glossary