ANVILFIELD Try FieldOS

Field glossary · measurement

ET / ETo / ETc

ET is water lost through evaporation and plant transpiration. ETo represents a defined reference surface under the measured weather; ETc represents crop demand after applying a crop coefficient. These are depths over a stated time interval, not valve runtimes. Reference type, plant stage, soil-water stress, effective rain, and irrigation efficiency determine how the published number becomes an applied-water requirement.

Evapotranspiration: reference demand ETo scaled by a crop coefficient to the plant need ETc

Used across 2 Anvilfield field guides, most in Landscaping.
Updated

What surface does ETo actually represent?

FAO Irrigation and Drainage Paper 56 (1998) defines its ETo reference as well-watered grass 0.12 metre high, with surface resistance of 70 seconds per metre and albedo of 0.23. This mathematical reference holds the surface constant so weather effects can be compared. It does not describe the actual height or water status of the landscape being irrigated.

Save the reference type and reporting period with an ET feed. An hourly value, a daily total, and a weekly total are all valid depths but cannot be interchanged without summing or converting time. A station total also represents its measured weather; a sheltered courtyard has a different exposure from an open weather station.

Why standard ETc differs from stressed-plant loss

FAO-56 Chapter 6 defines standard crop evapotranspiration for a healthy, well-managed crop without soil-water limitation. Its crop coefficient changes through initial, development, mid-season, and late-season stages. A coefficient is therefore associated with a plant condition and growth stage, rather than permanently attached to a valve.

FAO-56 Chapter 8 introduces the water-stress coefficient Ks to reduce modeled crop evapotranspiration when root-zone depletion limits uptake. Reduced actual water use under severe drought does not mean that the healthy plant's potential demand disappeared. Keep demand, water supplied, and observed stress as separate quantities.

Carry one week of depths through the water budget

Keep the crop-demand calculation, rainfall credit, and application-loss allowance visible on separate lines. For ETo of 1.40 inches, Kc of 0.70, effective rain of 0.20 inch, and application efficiency of 0.75, the weekly water budget is:

The irrigation audit guide supplies measured application rate and distribution data; the controller guide converts the selected depth to time. A separate uniformity adjustment needs a defined role so the same distribution loss is not charged twice.

QuantityCalculationWeekly depth
Reference demand EToWeather total1.40 inches
Standard crop demand ETc1.40 x 0.700.98 inch
Net irrigation depth0.98 - 0.20 effective rain0.78 inch
Gross applied depth0.78 / 0.75 efficiency1.04 inches

Distinctions

Effective rainfall
The portion retained where roots can use it. Gauge rainfall that runs off or drains below the root zone is not all effective replacement.
ETo versus ETc
ETo is reference weather demand. ETc adds the selected crop coefficient; neither quantity alone describes system application losses.

Frequently asked questions

Can I subtract inches of rain from millimetres of ET?

Convert first: 1 inch equals 25.4 millimetres. Use the same depth units and matching dates before computing the water balance.

Sources checked

Where this shows up

Next step: Plan an irrigation territory

Back to the full field glossary