Field glossary · measurement
PR
PR is precipitation rate: irrigation output expressed as water depth per hour. The unit makes a sprinkler's output comparable with the depth a planting needs, but the measurement basis matters. A meter-based calculation counts all zone flow, including leaks and spray beyond the measured area; catch cups sample delivery within that area. Keep calculated output and measured delivery labeled separately when diagnosing a mismatch.
Precipitation rate, the depth a zone applies per hour in inches per hour, measured or calculated
Match nozzle flow to the arc it covers
Applying Rain Bird's matched-precipitation rule to equal-radius sectors gives a 4:2:1 flow relationship for 360-, 180-, and 90-degree coverage. The same proportion works with another base flow: 6, 3, and 1.5 GPM are also proportionate. Radius, spacing, operating pressure, and compatible patterns still belong in the nozzle selection.
Giving every sector 4 GPM would concentrate four times the water per unit area in the quarter-circle sector compared with the full circle. The takeoff below preserves arc and flow together, so a replacement nozzle can be checked against the other heads without relying on its color or appearance.
| Coverage arc | Proportion of a full circle | Matched flow in this set |
|---|---|---|
| 360 degrees | 1 | 4 GPM |
| 180 degrees | 1/2 | 2 GPM |
| 90 degrees | 1/4 | 1 GPM |
Use the right area in the denominator
Using New Mexico State University's H-504 conversion, a 15 GPM zone covering 1,500 square feet calculates as 96.3 x 15 / 1,500 = 0.963 inch per hour. Measure the irrigated ground once; adding overlapping sprinkler circles would enlarge the denominator and understate the rate.
The unit check is critical on drip takeoffs. A zone totaling 120 gallons per hour delivers 2 GPM; across a 600-square-foot bed, the equivalent average is 96.3 x 2 / 600 = 0.321 inch per hour. Entering 120 as GPM produces 19.26 inches per hour, a sixtyfold error. The whole-bed equivalent also differs from the local intensity around each emitter's wetted patch.
Separate application intensity from evenness
Rain Bird lists fan-spray application capability at approximately 1 to 4 inches per hour. That range describes intensity, rather than a guarantee that soil can absorb it or that the pattern is uniform. A high average PR and poor distribution can occur together.
In the audit record, retain average catch depth and the lower-quarter result separately. Two zones with the same average depth can have very different dry patches. Use the controller schedule for total runtime and the measured intake behavior to divide that time into cycles.
Distinctions
- Solar performance ratio
- A dimensionless performance measure rather than a water application rate. A PR value without units needs its domain identified.
- Precipitation rate (PR)
- The full-name glossary route describes the same irrigation quantity. PR here supplies the abbreviation, unit checks, and nozzle-arc relationship.
Frequently asked questions
Is a lower PR always more efficient?
Lower intensity can improve infiltration on a slow-intake soil, but efficiency also depends on coverage, losses, and scheduling. Compare the measured distribution and site response as well as the hourly rate.