ANVILFIELD Try FieldOS

Field glossary · component

PVB

For a FEBCO 765 pressure vacuum breaker (PVB), standing at least 12 in. above the highest downstream piping and outlet is part of backsiphonage protection. Discharge pressure must remain above 3 psi in 1/2 through 1-1/4 in. sizes and above 5 psi in 1-1/2 through 2 in. sizes to seat the air inlet. A downstream pump creates a backpressure hazard this assembly does not cover, even after a successful field test.

Pressure vacuum breaker; one check and an air inlet, back-siphonage only, holds continuous pressure, testable (ASSE 1020)

Used across 2 Anvilfield field guides, most in Plumbing.
Updated

An elevated pipe reroute can defeat the installation

ASSE lists 1020-2020(R2025) as the current PVB performance standard and limits its scope to backsiphonage protection for high- and low-hazard applications. A downstream pump or pressurized chemical connection creates a different reverse-flow mechanism. The PVB designation does not cover that backpressure condition.

Locate the actual highest downstream pipe as well as the highest outlet. FEBCO specifies its Series 765 at least 12 inches above both the highest downstream piping and outlet. A later reroute over a wall or the addition of an elevated outlet can invalidate an installation that was correctly positioned when first installed. The assembly-selection guide explains the alternatives for different hazards.

Air-inlet seating pressure is an operating limit

FEBCO calls for discharge pressure above 3 psi on Series 765 sizes 1/2 through 1-1/4 inch, and above 5 psi on sizes 1-1/2 through 2 inches, to seat the air-inlet poppet. Those are model-specific operating requirements, separate from a field-test opening or check-holding criterion.

For example, a 1-1/2-inch 765 serving an open irrigation zone at 4 psi downstream is below its stated seating requirement. Water at the air inlet in that condition does not establish that replacing the poppet alone will solve the problem. Compare the pressure while that zone is running, then trace the available supply and the zone's demand.

A single quiet reading with all zones closed misses the condition. Record the lowest downstream pressure during operation, the zone involved and the valve size. The location of the measurement should be clear enough to repeat it after a repair.

Do not confuse the test rating with the service rating

FEBCO lists 150 psi maximum working pressure and 300 psi hydrostatic test pressure for the 765. The higher number is not permission to operate the assembly continuously at 300 psi. Its listed temperature range is 32 to 140°F; that lower endpoint does not make water trapped inside safe from freezing.

Drainage around the assembly must accommodate air-inlet discharge without submerging the opening. Keep the model and size legible for rebuilding and winterization, since bonnet and internal-part selection follows the particular assembly. Where the downstream use changes, revisit the protection type before treating the work as a routine parts replacement.

Distinctions

Atmospheric vacuum breaker
A different device with restrictions on continuous pressure and downstream shutoffs; PVB installation rules cannot simply be applied to it.
RP / RPZ
Uses two checks and an intermediate relief arrangement to address both backsiphonage and backpressure within its approved application.

Frequently asked questions

Does PVB mean the same thing in glass specifications?

No. Glazing documents use PVB for polyvinyl butyral interlayer. The expansion of the abbreviation must follow the trade and the equipment schedule.

Sources checked

Also defined as

  • Pressure vacuum breaker, a single check plus an air inlet for backsiphonage-only protection (ASSE 1020)

Where this shows up

Next step: Build irrigation service lists

Back to the full field glossary