Field glossary · measurement
Pressure drop
A compressed-air header at 108 psig feeding a tool at 96 psig has a 12 psi pressure drop at the measured demand. Natural Resources Canada estimates about 1 percent more full-output compressor energy per 2 psi of added discharge pressure near 100 psig. Measure both taps together and identify each restriction before raising the compressor setting; readings taken at different loads cannot establish the same loss.
Pressure lost to the pipe, fittings, and treatment between compressor and tool
Define the boundary before assigning the loss
Mark the two pressure taps on the sketch: across the dryer, across the filter bank or from receiver outlet to tool inlet. Read them together while the process is drawing air. Measurements taken during different compressor loading states combine distribution loss with a changing source pressure.
At a recorded demand, an air header at 108 psig and a tool connection at 96 psig have a measured 12 psi difference. Simultaneous component readings allocate that drop as follows; their sum leaves no unexplained loss to assign to the main.
| Measured boundary | Pressure drop (psi) |
|---|---|
| Dryer inlet to outlet | 3 |
| Filter inlet to outlet | 4 |
| Hose and couplings | 5 |
| Header to tool, total | 12 |
Estimate the energy cost of a higher pressure setting
Natural Resources Canada recommends compressed-air distribution losses much less than 10 percent of compressor discharge pressure. Its rule for systems around 100 psig is approximately 1 percent more compressor energy at full output for each 2 psi increase in discharge pressure.
Using that NRCan rule, raising discharge pressure by 12 psi to compensate for the measured loss adds approximately 6 percent to full-output compression energy. Restoring a restricted coupling or filter removes resistance at its source; increasing the pressure setting leaves the restriction in service. On the compressed-air piping layout, mark the measured losses beside their components to make the repair priority visible.
Normalize readings before diagnosing a filter
NRCan states that doubling compressed-air filter capacity can reduce its pressure loss by a factor of four. That relationship explains why media area and operating flow belong with every differential reading: a pressure-drop change is not automatically a dirt-loading change.
An air-handling filter read at low fan speed needs comparison with its clean performance at that same airflow. Keep media type, installed area and airflow with the filtration service baseline, especially after changing filter depth or fan speed.
WIKA's differential-pressure training relates the pressure difference across a calibrated flow restriction to flow squared. Such a restriction measures flow through a known relationship; an arbitrary dirty filter does not become a flow meter merely because it has two pressure taps.
Distinctions
- Pressure decay
- Pressure decay compares one location at different times in a closed test volume. Temperature and leakage affect it.
- Static head difference
- Elevation changes pressure even without friction. Across vertical water piping, separate that height contribution from dissipative loss.
Frequently asked questions
Should a higher MERV rating have a fixed pressure-drop allowance?
Use the selected filter’s resistance data at its actual airflow and installed area. MERV describes particle capture; the number alone does not establish resistance.
Sources checked
Also defined as
- HVAC: The static the filter adds to the airstream, in inches of water column, initial when clean and final when loaded