Thermal drift

Thermal drift is the temperature-related component of a hydrostatic pressure reading, including both actual pressure movement and the gauge's own temperature error. WIKA PM 03.02 (March 2025) allows up to ±0.4% of full scale per 10°C for models 311.11 and 331.11, equivalent to ±1.6 psi on a 400 psi gauge. Separate that instrument contribution from changes in the enclosed water and pipe volume, then judge tightness under the specified test method.

A pressure change on a long hold caused by the test water warming or cooling, read against the temperature log so it is not mistaken for a leak

Used across 2 Anvilfield field guides, most in Plumbing.
Updated

Thermal drift, trapped air and HDPE creep

PPI TN-46, revised July 2021, identifies temperature variation, trapped air and pipe creep as separate influences on HDPE hydrotesting. The water occupies a container that also changes volume. A flexible pipe wall and a compressed air pocket absorb volume changes differently from a water-filled rigid section, so a pressure-per-degree correction depends on the assembly being tested.

A fixed psi-per-degree adjustment borrowed from a steel loop cannot account for an HDPE section's time-dependent expansion. Add the pipe material and test phase to the record used with the plumbing hydrostatic test guide; those fields distinguish a temperature response from a pressure change that continues as the pipe creeps.

How much temperature error can the gauge add?

WIKA's March 2025 PM 03.02 data sheet specifies a maximum temperature error of ±0.4% of full scale per 10°C departure from the 20°C reference condition for its 311.11 and 331.11 test gauges. That percentage applies to the instrument's full-scale value, not the pressure indicated by the pointer.

The coefficient concerns the gauge's measuring system, so a water-temperature reading farther along the pipe does not establish the gauge's thermal condition. In a chilled-water hydrotest package, identify the temperature-sensor locations and any change in gauge exposure alongside the instrument model and scale. WIKA's signed error band gives an uncertainty contribution, not a measured offset to subtract from the trace.

How long does HDPE need to stabilize?

PPI TN-46 (2021) recommends allowing 3 to 24 hours after filling an HDPE pipeline for thermal equilibration and dissolved-air release, with the interval driven by the contained water volume. That preparation period precedes the pressure test; it is separate from the specified acceptance hold.

Budget that interval as preparation time when scheduling the witness. The PPI range is specific to HDPE pipeline equilibration; it supplies neither an acceptance hold for building plumbing nor a drift tolerance for steel piping. Separate the filling, stabilization, expansion and acceptance timestamps so an overnight preparation period does not become credited test time.

Creep allowance does not authorize leakage

ASTM F2164-26 permits no leakage allowance for a section of heat-fusion-joined polyethylene piping. Its public explanation distinguishes the initial expansion phase, when makeup water compensates for pipe growth, from the subsequent test phase at reduced pressure.

ASTM F2164-26 separately recognizes that other connection types can have manufacturer-defined leakage allowances. Identify those connections in a mixed-joint test section; a fused-pipe rule does not establish an allowance for a mechanical seal. The standard covers PE and PEX pressure piping and excludes non-thermoplastic systems, so its expansion provisions do not govern a steel chilled-water loop.

Distinctions

Temperature derating
PPI TN-46 treats test-temperature compensation of the permissible pressure separately from interpretation of the pressure trace. A lower temperature-adjusted pressure ceiling is a component-rating limit, not permission for the gauge to lose that amount during a hold.
Instrument error versus actual pressure change
WIKA's temperature coefficient bounds an indication error. Water expansion changes the pressure applied to the instrument. Subtracting the full WIKA error limit as though it were a measured thermal pressure rise combines two different quantities.

Field example

A WIKA 331.11 gauge with a 0 to 400 psi scale has its measuring system warm from the 20°C reference condition to 30°C. Applying WIKA's March 2025 data-sheet coefficient gives a temperature-error limit of ±1.6 psi: 400 × 0.004 × 10/10. Calculating 0.4% of a 150 psi reading would instead give 0.6 psi and understate this limit. A recorded 1 psi fall therefore fits inside this temperature-error band, but the band does not establish why the reading fell or excuse a visible leak. Retain the gauge's basic accuracy and the piping's actual pressure response as separate contributions.

Frequently asked questions

Can thermal drift hide a leak during a pressure test?

Yes. Warming and leakage can act in opposite directions, so their combined trace can look flat. That is why a temperature correlation does not demonstrate tightness. ASTM F2164-26's zero leakage allowance for heat-fusion-joined PE remains a separate acceptance rule.

Is pressure loss at constant temperature always a leak?

Polyethylene creep is another cause. PPI TN-46 describes pressure decay as the pressurized pipe expands, even without water escaping. Identify whether the reading belongs to initial expansion or to the acceptance phase before assigning a cause.