Field glossary · measurement
Pre-charge
Pre-charge is the gas setting measured with the tank's water side empty and depressurized. Amtrol's Well-X-Trol on a 40 psig pump cut-in uses 38 psig, whereas a Therm-X-Trol supplied at 70 psig uses 70 psig. Hydronic expansion tanks follow the minimum system pressure at their connection. Once water compresses the gas, the air gauge reads operating pressure; an overcharged tank need not show agreement between its air and water gauges.
The air pressure on the sealed side of the tank, set to match the system static pressure before the tank is connected
Choose the setting from the tank’s function
Amtrol's Well-X-Trol and Therm-X-Trol instructions produce different empty-tank targets for the same 40 psig water-system label: a well switch cutting in at 40 psig calls for 38 psig pre-charge, while a domestic expansion tank supplied at 40 psig calls for 40 psig. This comparison uses the Well-X-Trol's 2 psi offset and the Therm-X-Trol's supply-matching rule; swapping those rules changes when water first enters the tank.
Amtrol's Extrol L-Series instructions match pre-charge to the minimum system pressure at the tank location. In a hydronic loop, use the cold fill pressure at that connection, rather than the domestic supply pressure or the boiler's relief setting. Record the connection elevation because a pressure measured on another floor is a different reference.
The commercial Well-X-Trol manual also distinguishes surge service: Amtrol specifies pre-charge 10 to 20 percent below system pressure for that application. A tank marked with a factory pressure has not thereby been configured for its installed duty. Identify the model and service before interpreting the number.
Calculate the space a low charge consumes
Amtrol's Therm-X-Trol sizing guidance uses Boyle's law to explain how incoming water compresses a low pre-charge before heating begins. With constant gas temperature, use absolute pressures: gas volume after compression = initial gas volume × initial absolute pressure / final absolute pressure.
A 20 gal gas space charged to 40 psig and connected to 70 psig cold water shrinks to 20 × 54.7 / 84.7 = 12.92 gal, using 14.7 psi atmospheric pressure. About 7.08 gal of water has entered before thermal expansion starts. The number quantifies the space already occupied; it is not the tank manufacturer's acceptance-volume rating.
Raise that water pressure to 100 psig and the calculated gas space becomes 9.54 gal. Only another 3.38 gal enters during the rise from 70 to 100 psig. Starting with a matching 70 psig pre-charge instead leaves 5.23 gal of calculated expansion space over the same pressure rise. Use the selected tank's rated acceptance limit when applying that gas-cushion calculation.
Make the next measurement comparable
Establish an empty water chamber and 0 psig at its water connection before measuring pre-charge; isolating a tank without draining it leaves water pressure trapped. Record that condition with the gas temperature, gauge and system setpoint. Amtrol's tank instructions also restrict repressurizing damaged or corroded vessels, so a lost charge is a tank-condition finding rather than an automatic instruction to add air.
Keep the initial charge and the actual switch settings beside the well-system record. For domestic expansion work, attach the matching cold-pressure reading to the closed-system tank record. A changed pressure-reducing valve setting changes the charge comparison even when the tank itself has not changed.
Distinctions
- Drawdown
- The same vessel can deliver different drawdown after a switch-setting change because the gas compresses through a different absolute-pressure ratio. Pre-charge is an input to that storage calculation, not the delivered gallons.
Frequently asked questions
Why does the air valve show the same pressure as the water gauge?
The gauges agree while water is compressing the gas and the diaphragm is free to move. If pre-charge exceeds the available water pressure, the tank can remain empty and the air gauge can read higher. Equal live readings therefore neither prove the original charge nor describe every connected tank.
Sources checked
- Amtrol: Well-X-Trol installation and operation instructions, September 2019
- Amtrol: Commercial Well-X-Trol instructions, April 2024
- Amtrol: Therm-X-Trol ST-5C through ST-210VC instructions, April 2024
- Amtrol: Therm-X-Trol sizing guidance and Boyle’s-law explanation
- Amtrol: Extrol L-Series installation instructions, January 2019
Also defined as
- HVAC: The air pressure set in a diaphragm or bladder tank, checked dry, matched to the system cold fill pressure
- The tank air pressure, set about 2 psi below cut-in with the tank empty