ANVILFIELD Try FieldOS

Field glossary · safety

T&P valve

A T&P valve is a combined temperature-and-pressure relief valve for a water heater or hot-water vessel. Either excessive temperature or excessive pressure can open it. A correct replacement must match the vessel’s permitted pressure, provide adequate rated relieving capacity, and place its temperature sensor in the specified water zone; matching pipe threads alone is insufficient.

The temperature and pressure relief valve on the heater, a safety device relieving at 150 psi or 210 degrees F, never the expansion fix

Used across 2 Anvilfield field guides, most in Plumbing.
Updated

Read all three ratings before selecting a replacement

Watts’ 2025 specification for its extended-inlet 100XL family lists temperature relief at 210°F and available pressure settings of 75, 100, 125, and 150 psi. A valve from that family is therefore not identified completely by saying 100XL or three-quarter-inch.

Watts rates the listed extended-inlet models at 105,000 Btu/h and specifies relieving capacity greater than the heater’s input rating. A heater with 120,000 Btu/h input exceeds that listed capacity even when the connection threads fit. Put the input and certified relief capacity side by side in the replacement record.

A. O. Smith manual 100264218 Rev. B limits the relief-pressure setting to the vessel data-plate working pressure. On a vessel marked 125 psi, a valve marked 150 psi would leave a 25 psi gap above the permitted vessel pressure before its pressure setting was reached. Thread size does not resolve that mismatch.

The inlet extension must put the sensor in water

Watts requires the temperature-sensing element of the extended-inlet 100XL family to be immersed within the top 6 inches of tank water. A valve that screws into an added fitting but leaves the sensing element outside that zone has not reproduced the listed sensing arrangement.

The same specification distinguishes inlet lengths for different insulation thicknesses: SL100XL for up to 1¾ inches, L100XL for 2 inches, LL100XL for 2½ inches, and LLL100XL for 3 inches. Those model differences solve a physical reach problem. Overall valve length or an apparently similar brass body is not a substitute for the correct insertion geometry.

Trace the discharge path as part of valve selection

Watts specifies discharge piping the same size as the relief outlet and pitched downward to visible disposal. A. O. Smith’s cited manual excludes valves, plugs, and other restrictions between the relief valve and the end of the discharge pipe. Include that route in the replacement scope instead of stopping the inspection at the brass body.

Record the pipe material, size, route, and termination with the valve tag. A new valve attached to a reduced or blocked discharge path does not reproduce the manufacturer’s required protection arrangement.

Reinspection is more than moving the lever

Watts calls for reinspection of the T&P valve at least once every three years by a licensed plumbing contractor or authorized inspection agency. Its stated purpose includes corrosion and alterations to the valve or discharge line. That inspection examines the protection arrangement, not just whether the lever moves.

Keep a readable image of the valve tag, heater rating, insertion arrangement, and discharge route. Record why a replacement was selected so a later technician can distinguish an intentional lower pressure setting from an ordering error.

The water-heater maintenance guide covers service tasks, and the closed-system expansion guide addresses routine pressure growth. Relief-valve selection remains a separate protection decision even when an expansion fault caused the original discharge.

Sources checked

Also defined as

  • Temperature and pressure relief valve that opens at its marked settings to protect the tank

Where this shows up

Related guides

Next step: Browse heater replacement packages

Back to the full field glossary