Field glossary · component
Expansion tank
An expansion tank provides compressible gas space for water that expands as it heats. Its useful water acceptance is smaller than, and distinct from, the vessel’s labeled volume. A replacement therefore needs the required acceptance at the system’s pressure range, suitable temperature and pressure ratings, and approval for the fluid it will contact.
A bladder tank that absorbs the volume growth of heated water in a closed system
Two gallons of vessel is not two gallons of acceptance
Amtrol’s June 2023 Therm-X-Trol brochure lists tank volume and maximum acceptance separately, as shown below. Amtrol lists a maximum acceptance of 0.9 gallon for its 2.0-gallon ST-5, less than half the shell volume; a nominal tank size is therefore insufficient for a replacement order.
Maximum acceptance is a product limit. The water accepted during a particular heating cycle also depends on the starting and finishing pressures. Keep both quantities on the selection sheet: the calculated expansion volume and the selected model’s permitted acceptance.
| Amtrol model | Tank volume | Maximum acceptance |
|---|---|---|
| ST-5 | 2.0 gal | 0.9 gal |
| ST-12 | 4.4 gal | 3.2 gal |
Reading the pressure factor without guessing
Amtrol’s sizing bulletin assigns a design pressure factor of 2.1 at 60 psi supply pressure and 125 psi maximum allowable pressure. At 80 psi supply and a 125 psi limit, Amtrol tabulates a design pressure factor of 3.1. Less available pressure rise demands more vessel volume for the same quantity of expanded water.
For 2.0 gallons of calculated expansion, those factors produce 4.2 gallons and 6.2 gallons of required tank volume respectively. At 60 psi supply, the ST-12 clears both requirements: 4.4 gallons of vessel exceeds 4.2, and 3.2 gallons of maximum acceptance exceeds 2.0. At 80 psi supply, that same ST-12 falls below the 6.2-gallon vessel requirement even though its maximum acceptance still exceeds the expansion volume.
A replacement record that survives a model change
Record the application, model, vessel volume, maximum acceptance, supply pressure, maximum design pressure, and the fluid-temperature range. Include glycol concentration for hydronic service. A photograph of a similarly sized shell supplies none of the pressure-factor information.
Anvilfield’s hydronic tank guide explains air control and installation. The water-heater maintenance guide covers the domestic side, and thermal movement separates vessel acceptance from pipe growth. Use the manufacturer’s selection for the actual service when crossing between those applications.
Distinctions
- Maximum acceptance versus operating acceptance
- Maximum acceptance is the model’s water-side capacity limit. Operating acceptance is the amount available over the selected cold-to-hot pressure band, which the sizing calculation must establish.
Frequently asked questions
Does a larger tank automatically solve repeated relief discharge?
No. Increasing vessel size does not correct an isolated connection or an incorrectly set air charge. Preserve the measured pressure history so the replacement addresses the actual failure.
Sources checked
Also defined as
- HVAC: A vessel with an air cushion that absorbs the water expanding in a closed loop and holds the system pressure
- Bladder tank that absorbs thermal expansion on a closed plumbing system