ANVILFIELD Try FieldOS

Field glossary · business

Anchor

In a service proposal, an anchor can be yesterday's repair invoice, a competitor's quote or the first package presented. Each gives the buyer a different reference for the same new price. Record which reference the buyer actually uses, then compare equal coverage and contract periods. An arbitrary starting number can influence a judgment even when it says nothing about the work's cost or value.

The high option presented first, against which the middle option reads as the reasonable choice

Used across 2 Anvilfield field guides, most in HVAC.
Updated

What anchoring research actually demonstrates

Tversky and Kahneman's 1974 Science paper reported median estimates of 25% and 45% after groups received arbitrary starting numbers of 10 and 65 in a United Nations estimation task. The medians differed by 20 percentage points even though the starting numbers carried no information about the answer. A service proposal supplies a more useful reference when its price is tied to an explicit scope.

Tversky and Kahneman also reported that accuracy incentives did not reduce anchoring in their 1974 estimation experiment. That finding measures numerical judgment; it supplies no predicted improvement in service-proposal acceptance. Test presentation order against signed, completed work while keeping the package scopes and lead mix comparable.

Separate a package comparison from a claimed discount

The FTC's Guides Against Deceptive Pricing, 16 CFR 233.1 in the 2026 CFR, describe a legitimate former-price comparison as one based on a genuine price regularly offered for a substantial period. An invented higher price does not become a valid savings reference by appearing above the selling price on a proposal.

The FTC explains in Section 233.1 that a former price is not automatically fictitious merely because no sale occurred at it. The question is the history and good faith of the offer. Keep records supporting any claimed former price separately from the scope comparison in the proposal and closing guide.

Measure the result after the presentation

Compare acceptance and contribution for proposals with the same job type, lead source and scope choices. Record which package was shown first, which was selected and whether a later cancellation or scope reduction followed. A higher average invoice without retained margin or fulfilled work is a poor measure of the presentation's commercial result.

Distinctions

Pipe anchor
A restraint that directs thermal pipe movement is a physical component. Its capacity and location are unrelated to pricing psychology.

Field example

Two groups each receive 40 proposals with the same package choices. The first group accepts 18; the second accepts 22 after the display order changes. Acceptance is 45% versus 55%, a difference of 10 percentage points and four jobs. Record cancellations and contribution from those jobs before assigning a commercial benefit to the presentation change.

Frequently asked questions

Does the highest option always sell the middle option?

The anchoring experiment establishes an influence on judgment, not a guaranteed package choice. Track actual selections and margins for the proposals your company issues.

Sources checked

Also defined as

  • Plumbing: A fixed point that stops the pipe from moving there and aims the growth elsewhere

Where this shows up

Next step: Calculate lead list ROI

Back to the full field glossary