Field glossary · business
Average ticket
Average ticket turns a selected set of completed jobs into one revenue figure per job: $48,000 across 100 jobs gives a $480 ticket. The count must describe the same work that produced the revenue. No-charge visits, unsold opportunities and replacements change that population. Publish the included job types, completion dates and no-charge rule with the result so another estimator can reproduce it.
Revenue per completed job; rises when good-better-best options are presented
Which jobs belong in the average-ticket denominator?
ServiceTitan's Total Job Average includes no-charge jobs, while its dashboard's primary average-ticket measure, Opportunity Job Average, uses a narrower population. ServiceTitan includes a completed No Charge job in Opportunity Job Average when its invoice subtotal meets that job type's sold threshold. The flag alone therefore does not determine which jobs enter that average. Keep the threshold and invoice subtotal in the export used to reconcile it.
ServiceTitan's methodology for its 2020 and 2021 Benchmark Report includes recalls, warranties and no-charge jobs in average ticket. A shop comparing itself with that report needs the corresponding total-job population. Removing return visits from the denominator produces a different measure, rather than an improvement against that benchmark.
Completed jobs produce $48,000 from 80 billable calls and 20 zero-dollar warranty visits. The all-job average is $480; excluding those 20 visits produces $600. No additional work was sold. Keep the inclusion rule with the business dashboard so a filter change does not become a reported sales gain.
A bigger replacement share can lift a weaker month
A service department completes 90 repairs averaging $400 and 10 replacements averaging $8,000. Revenue is $116,000 and the combined ticket is $1,160. The next month brings 70 repairs averaging $380 and 30 replacements averaging $7,600. Revenue reaches $254,600 and the combined ticket becomes $2,546.
Each work category lost 5% of its average value, yet the combined average more than doubled because replacements occupy more of the job count. Report the repair and replacement averages alongside their counts. This separates a change in work mix from the option-presentation results discussed in the flat-rate price-book guide.
Match revenue and dates before ranking technicians
ServiceTitan calculates Completed Revenue from income-account items on completed job invoices; its Total Revenue also includes non-job revenue and adjustment revenue. Dividing that larger total by completed service calls would attach unrelated income to those calls. Export the job identifiers and income amounts behind the numerator before comparing report totals.
The same documentation dates Total Sales by the estimate's sold-on date. An estimate sold this month and installed next month belongs to different periods in sales and completed-work reporting. Name a sold-job average separately from a completed-job average when reviewing the proposal pipeline. Preserve job type, no-charge status and completion date in the comparison export.
Frequently asked questions
Is average ticket the same as the median invoice?
Average ticket is an arithmetic mean. For five completed jobs worth $150, $200, $250, $300 and $9,100, the mean is $2,000 but the median is $250. The median identifies the middle job; the mean distributes all revenue across the job count.
Does an opportunity average include only sold jobs?
ServiceTitan separates Opportunity Job Average from Converted Job Average. Converted Job Average includes only opportunities that meet the sold threshold; an opportunity average also includes opportunities that did not convert. Label the exported metric explicitly before comparing technicians or months.
Sources checked
Also defined as
- HVAC: The value of the typical signed job, a read on whether options and financing move customers up