Field glossary · business
Markup vs margin
A $4,800 cost priced with 40% markup becomes a $6,720 quote with 28.57% margin; pricing that cost for 40% margin requires $8,000. The two settings leave $1,920 and $3,200, respectively, above the same cost basis. Identify the included costs and the software's pricing mode before transferring a percentage between estimates.
Markup is the multiplier on cost; margin is profit as a percent of price; they are different numbers
Read the estimating software's pricing mode
Trimble Quest identifies markup as its default mode when assigning profit to bill items, while allowing the user to select margin mode. A percentage copied from another estimate needs its mode as well as its value. The same number entered into those two settings produces different selling rates.
Using Trimble Quest's published formulas, a $4,800 cost with 40% markup sells for $6,720, while a 40% margin requires an $8,000 selling price. The first setting leaves a 28.57% margin. Record the selected mode in the estimate export so a reviewer can reproduce the rate without reopening the software.
Use the cost build-up from the plumbing estimating guide as the audit input. Divide the exported selling price by that cost to recover the actual multiplier: 1.60 corresponds to 60% markup and 37.5% margin. Compare that result with the saved pricing-mode setting to locate a rate entered under the wrong mode.
How much gross profit does a discount consume?
Applying Procore's margin formula to a $1,000 sale with $600 cost, a 10% price discount cuts gross profit by 25%, from $400 to $300. Gross margin drops from 40% to 33.33% because the reduced selling price is $900 while cost remains $600. This calculation holds the cost basis fixed.
At the discounted price, four otherwise identical jobs produce the same $1,200 gross profit as three jobs at the original price. That requires one-third more jobs, with the same per-job cost. Additional dispatch, overtime or capacity costs raise the required recovery further. Price concessions need this calculation before they become a standard sales practice.
To retain a required margin g after discount d, calculate the list price as cost / ((1 - g) x (1 - d)), using decimal fractions. With $600 cost, a required 40% margin and a planned 10% discount, the list price is $1,111.11; the discounted price rounds to $1,000.
Blend margins by revenue and identify compounded markups
A package contains $80,000 of equipment revenue at 20% gross margin and $20,000 of labor revenue at 50% gross margin. Gross profit is $16,000 plus $10,000, giving a 26% package margin on $100,000 revenue. Averaging the two percentages to obtain 35% would give equal weight to unequal revenue amounts. Keep the cost boundary consistent across both lines.
Successive markups also need their bases identified. Adding 10% and another 10% to the same $10,000 cost produces $12,000. Applying the second 10% to the already increased $11,000 produces $12,100, a 21% total markup. Specify whether overhead and profit use the same base or successive bases in the overhead-recovery worksheet.
Frequently asked questions
Can markup exceed 100 percent?
Yes. An item costing $200 and selling for $600 has 200% markup and 66.67% margin. The $400 spread is twice the cost, but only two-thirds of the invoice total.
Sources checked
Also defined as
- Paving: Markup is profit as a percent of cost; margin is profit as a percent of price; a 20 percent margin needs a 25 percent markup
- Electrical: Markup is profit as a percent of cost; margin is profit as a percent of price; margin is always smaller