ANVILFIELD Try FieldOS

Field glossary · measurement

Static head

Static head depends on the source and destination conditions: two open water surfaces 30 ft apart require 30 ft before friction. Using the Hydraulic Institute's boundary equation, putting the receiving surface under 10 psig adds 23.1 ft, raising the total to 53.1 ft. A filled closed hydronic loop instead balances its rising and falling legs; its roof height sets local pressure requirements without becoming net circulator lift.

The pressure to lift water, about 0.43 psi per foot of elevation, or 1 psi per 2.31 ft

Used across 5 Anvilfield field guides, most in Plumbing.
Updated

Choose the liquid boundaries before measuring the height

The Hydraulic Institute's system-curve method includes both elevation difference and the difference in pressure head at the system boundaries. A pump drawing from an open tank into another open tank 30 ft higher has 30 ft of static head, even if the pipe rises 40 ft on the way and then descends to the receiving tank.

Pressurize the receiving tank to 10 psig while leaving the source open, and the pressure difference adds about 23.1 ft of water head. The total becomes 53.1 ft before friction. That additional requirement disappears only if the two boundary pressures become equal; it is not removed by shortening the pipe.

The route's high point still matters for filling, venting and local absolute pressure. Endpoint accounting assumes a continuous liquid path. An unprimed siphon or an air-bound summit is a separate operating condition, not a reason to silently replace the destination elevation with the summit elevation.

A closed loop has elevation pressure without net lift

Taco's Commercial Hydronic Application Information states that a closed circulating system has no net static lift and that its resistance curve begins at zero flow and zero head. The rising leg's elevation change is balanced by the descending leg around the complete circuit.

That does not make pressure uniform from basement to roof. Taco's water-head conversion of 2.31 ft per psi means a 90 ft vertical water column creates about a 39 psi pressure difference between its top and bottom. Fill pressure must establish the intended pressure at the top even though the circulator does not add 90 ft of lift on every circuit.

Keep those tasks separate in the expansion-tank and air-separator guide: fill pressure establishes the system's pressure condition, while circulator differential drives flow through its resistance.

Use the water levels that can actually occur

An open source tank falling 6 ft increases static lift by 6 ft if the destination level is unchanged. A receiving tank filling 4 ft higher adds another 4 ft. The two changes combine to move the static requirement by 10 ft.

Calculate both low and high operating levels, and retain the elevation datum on the sketch. A pump selected only at the most favorable levels can lose capacity as the source empties. Conversely, a favorable downhill level difference can drive gravity flow even with the pump stopped unless the piping arrangement prevents it.

Pressure-zone calculations need the same boundary discipline. The pressure assigned to a roof tank, booster outlet or expansion-tank connection must be tied to its elevation; moving that pressure unchanged to another floor discards the static contribution.

Distinctions

Static pressure
The local pressure at a point; different elevations can have different static pressures within the same connected water column.
Friction head
A flow-dependent loss that changes with flow rate, pipe roughness, diameter and fittings.

Frequently asked questions

Is static head the depth of a submersible pump?

For transfer between water surfaces, use the source water level rather than the pump’s setting depth. The submerged depth affects local pressure and equipment conditions but is not automatically the lift between system endpoints.

Sources checked

Also defined as

  • HVAC: The pressure from the height of water above a point, about 0.433 psi per foot, that sets the cold fill pressure
  • HVAC: The pressure a vertical liquid column loses to height, about 0.5 psi per foot of lift for common refrigerants

Where this shows up

Next step: Locate water tower owners

Back to the full field glossary