ANVILFIELD Try FieldOS

Field glossary · property

Diversity

Diversity describes how individual loads differ in timing, reducing the aggregate peak below the sum of their separate peaks. In water distribution, fixture count, flow rate and probability of use determine that relationship. A probable peak is still greater than average demand. Carry the adopted method and occupancy assumptions with the result; a diversity allowance from one system is not a percentage to reuse on another.

The statistical fact that not all fixtures draw at once, which the demand curve builds in

Used across 2 Anvilfield field guides, most in Plumbing.
Updated

Average demand is below a probable design peak

IAPMO’s July 13, 2026 Water Demand Calculator guide teaches probability through a Hunter-method toilet example: a 60 second refill repeated at 300 second intervals gives p = 0.20. That tutorial probability describes the stated toilet-use pattern; it is not a default probability for every fixture entered into the calculator.

For 100 independent toilets with that p = 0.20, the expected active count is 20. IAPMO places about 30 operating toilets at the example’s 99th-percentile boundary. If each draws 2 gpm while refilling, those two counts correspond to 40 gpm mean flow and 60 gpm probable peak; all 100 together would draw 200 gpm. The selected percentile, rather than the mean, determines this design comparison.

Use measured fixture behavior in the right building category

IAPMO identifies the Water Demand Calculator provisions in the 2024 Uniform Plumbing Code and describes its application to single-family and multifamily residential supply demand. That scope does not establish a sizing method for a factory process header or a stadium’s synchronized interval use.

The water-supply sizing guide explains the fixture-unit workflow. Keep the fixture flows, usage probabilities, building category and method version with the demand result. Two buildings with the same fixture count can have different simultaneous use because occupancy and schedules differ.

A time window changes the load being estimated

Instantaneous water-supply demand, a water heater’s hourly recovery requirement and annual water consumption are separate quantities. A short synchronized shower peak can be served partly from stored hot water while the heater recovers across a longer period. The water-heater selection guide carries that time basis into storage and recovery selection.

Describe the result as flow at the selected probable peak or volume over a stated period, rather than writing an unqualified “diversified load.” Changing that period changes what the number means even when the fixture inventory is identical.

Do not apply the reduction twice

A demand produced by a probabilistic sizing method already includes its modeled coincidence. Multiplying that output by an additional informal diversity percentage counts the same timing benefit twice. Preserve the unreduced inventory and apply one documented method to it.

A manually selected multiplier also cannot replace a justified gas demand reduction. New York’s 2025 Fuel Gas Code, Section 402.2, starts with simultaneous maximum appliance inputs and permits a reduced basis where diversity is established. The evidence for that exception belongs to the gas system itself.

Distinctions

Demand factor
Compares demand with connected load. State the numerator and denominator rather than treating every use of “diversity factor” as the same convention.
Route diversity
Describes physically separate power or communication paths. It concerns common failure exposure, not the coincidence of customer loads.

Frequently asked questions

Can I size water piping to average fixture use?

The mean is not the probable peak selected by the design method. IAPMO’s probability example distinguishes those values explicitly.

Should I reduce a calculator demand by another 20 percent?

A probabilistic demand already includes its model’s usage coincidence. An additional reduction needs a separate justified basis rather than a second informal diversity allowance.

Sources checked

Also defined as

  • The usage factor recognizing not all fixtures draw hot water at once

Where this shows up

Next step: Browse fixture modernization work

Back to the full field glossary