UEF

UEF, Uniform Energy Factor, is a dimensionless ratio of useful hot-water energy to input energy, calculated from DOE's 24-hour simulated-use test with corrections to reference conditions. Read the rating as part of a model record: fuel, draw bin and measured delivery capacity establish the comparison. In DOE FEMP's matched-load example, moving from UEF 3.30 to 3.93 reduces published annual electricity use from 984 to 826 kWh, a 16.1% reduction rather than the 19.1% increase in the rating.

Uniform Energy Factor, the DOE efficiency rating that replaced the older Energy Factor

Used across 2 Anvilfield field guides, most in Plumbing.
Updated

What conditions produce the UEF rating?

DOE's January 1, 2026 edition of 10 CFR Part 430, Subpart B, Appendix E specifies 58°F ±2°F inlet water and a 125°F ±5°F delivery target. Section 2.5 provides an exception for a flow-activated heater unable to reach that target: its maximum delivery-temperature setting is used. The nominal test temperature rise is 67°F.

For heat-pump testing, Appendix E uses nominal room air of 67.5°F and 50% relative humidity. These reference conditions explain why the published rating is not a direct measurement of a heater operating in a colder equipment room. Alongside the options in the water-heater types guide, record whether the proposed installation changes the air source or operating mode from the rated configuration.

Which draw bin belongs with the number?

DOE assigns non-flow-activated heaters to draw bins by measured first-hour rating, rather than nominal tank volume. Under the 2026 Appendix E, a first-hour rating of at least 51 gallons but less than 75 gallons selects the medium draw pattern, which withdraws 55 gallons over the test day.

The table combines Appendix E's capacity boundaries with its daily draw totals. At an FHR of 74 gallons, the test draws 55 gallons daily; at 75 gallons FHR, it draws 84. That one-gallon change in delivery rating changes the daily test load by 29 gallons. Carry the bin boundary into alternate-equipment comparisons alongside the peak-demand calculation in the heater sizing guide.

UEF draw binNon-flow-activated heater: first-hour ratingWater withdrawn over the test day
Very smallBelow 18 gallons10 gallons
Low18 to less than 51 gallons38 gallons
Medium51 to less than 75 gallons55 gallons
High75 gallons or more84 gallons

ENERGY STAR thresholds depend on the product category

ENERGY STAR Residential Water Heaters Version 5.0, effective April 18, 2023, sets a minimum UEF of 3.30 for integrated heat-pump water heaters, with separate 2.20 thresholds for integrated 120-volt/15-amp models and split systems. The current specification listing retains Version 5.0 as the applicable certification edition.

ENERGY STAR Version 5.0 requires a UEF of at least 0.95 for gas-fired instantaneous water heaters. Meeting a UEF threshold alone does not establish ENERGY STAR certification; the specification also sets delivery-capacity, warranty and safety criteria. A blanket 3.30 requirement excludes heat-pump categories with a 2.20 UEF threshold, so name the product category in the equipment schedule.

Worked comparison: higher UEF versus lower annual use

DOE FEMP's comparison based on June 2024 product data assigns 984 kWh/year to a UEF 3.30 electric water heater and 826 kWh/year to a UEF 3.93 model, both serving 20,075 gallons annually. That annual volume equals 55 gallons per day.

Using FEMP's rounded consumption figures, the difference is 158 kWh/year, or 16.1% of the 3.30 model's use. The UEF increase is 19.1%, calculated as 3.93/3.30 minus one. For equal delivered hot-water energy, the rating-based input-energy saving fraction is 1 minus old UEF divided by new UEF. That calculation gives 16.0% here; rounding of FEMP's annual kWh figures accounts for the small difference.

Put the annual consumption difference and its demand basis into the replacement bid comparison. When changing fuels, convert the input energy to the utility's billing units and apply each fuel's rate separately. UEF compares energy quantities; it contains neither a tariff nor an installation cost.

Distinctions

Annual energy consumption
UEF is dimensionless; annual consumption is an energy quantity tied to a draw schedule. FEMP's comparison pairs each UEF with kWh/year and annual gallons so the efficiency ratio retains its usage basis.

Frequently asked questions

Does tankless UEF use first-hour rating to choose a draw bin?

DOE uses maximum GPM for flow-activated heaters. Appendix E assigns the medium bin at 2.8 to less than 4.0 GPM and the high bin at 4.0 GPM or more. These are capacity-test results, not the flow needed to ignite the burner.

Is UEF the same as recovery efficiency?

No. For storage heaters, Appendix E section 6.3.3 assumes 98% recovery efficiency for immersed-element electric units other than heat-pump models. That assumption does not give the heater a 0.98 UEF: standby and cycling effects enter the overall rating separately. Keep recovery measurements and the model's published UEF in separate columns.