ANVILFIELD Try FieldOS

Field glossary · measurement

COP

A useful COP states matching output and input units, operating conditions and equipment boundary. For a reporting period, divide accumulated useful energy by accumulated input energy: equal 100-kWh heat deliveries at COP 4 and COP 2 combine to COP 2.67. ENERGY STAR's residential cold-climate criterion is at least 1.75 at 5°F under its specified test. That rating and a field result including resistance backup describe different boundaries and conditions.

Coefficient of performance, heat moved divided by energy used; greater than 1 on a heat pump

Used across 3 Anvilfield field guides, most in HVAC.
Updated

A ratio needs one operating condition and one boundary

ENERGY STAR's light-commercial HVAC criteria define heating COP from heating output and electrical input at a single set of operating conditions. A capacity taken at one outdoor temperature divided by power taken at another is not a valid rated COP, even when both figures appear on the same product sheet.

Include the equipment inputs specified by the rating or field-measurement boundary. A compressor-only reading, a complete packaged-unit reading and a building-system result that includes distribution pumps answer different questions. Label each input on the heat-pump operating record, including backup heat and auxiliaries that belong inside the selected boundary.

Why the average of 4 and 2 is not the seasonal result

A heat pump delivering 100 kWh of useful heat at COP 4 consumes 25 kWh. Delivering another 100 kWh at COP 2 consumes 50 kWh. Across both deliveries, COP is 200 / 75 = 2.67, not the arithmetic average of 3. Equal heat quantities weight the input-energy penalty of the lower COP more heavily.

Resistance backup must enter both sides of the same balance. With a heat pump supplying 12 kW of heat from 4 kW of electricity and a resistance stage supplying 6 kW from 6 kW, combined heating COP is 18 / 10 = 1.8. Reporting only the compressor circuit's COP 3 hides the backup input.

For trending, integrate thermal and electrical energy over identical periods. A defrost interval or a recovery call is part of the period's result when it lies inside the selected boundary. Record missing data intervals instead of pairing continuous electricity with an incomplete heat total.

Reading cold-climate and cooling ratings

ENERGY STAR requires a COP of at least 1.75 at 5°F for its cold-climate air-source heat-pump designation, measured under the stated Appendix M1 test. That is a defined low-temperature rating criterion, not a minimum operating COP at every condition in service.

DOE's Process Cooling System Cheat Sheet gives EER = COP x 3.413 when cooling output is expressed in Btu/h and input in watts. Thus EER 12 corresponds to cooling COP about 3.52 at the same condition and boundary. Seasonal efficiency ratings combine operation differently and should retain their own names.

A thermal-input absorption chiller uses supplied heat in its denominator. Its COP should not be compared directly with the electrical COP of a compressor machine as though the inputs were the same purchased resource.

Distinctions

Capacity
The heating or cooling output available. A high COP does not establish that the available output covers the load.
Effectiveness
A heat exchanger's actual transfer relative to an available transfer potential, rather than useful output divided by purchased input.

Frequently asked questions

Is COP dimensionless?

Yes. Convert output and input to matching power or energy units before dividing. Leaving Btu/h over watts produces EER for cooling, not dimensionless COP.

Can an operating COP be below one?

Yes. The ratio itself imposes no lower bound of one. Low useful output or substantial auxiliary input can reduce a system result below one.

Sources checked

Also defined as

  • Plumbing: Coefficient of performance, heat delivered per unit of energy drawn, how a heat pump beats UEF 1
  • Coefficient of performance, cooling output divided by power input, equals 3.516 / kW per ton

Where this shows up

Next step: Find rooftop performance accounts

Back to the full field glossary