Field glossary · measurement
Balance point
A capacity balance point locates the crossover between a building's heating demand and the selected heat pump's maximum output. In the worked load-and-capacity calculation below, the crossing is 21°F, so colder operation requires supplemental capacity. NEEP treats compressor lockout as a separate input. Keep this capacity crossover separate from the economic changeover temperature and the building's zero-heating-load temperature when setting controls.
Outdoor temperature where a heat pump's output equals the room's heat loss; below it the strip helps
Use the maximum-capacity curve
NEEP's Cold Climate Heat Pump Sizing Support Tools guide locates the capacity balance point at the intersection of the building load line and the heat pump's maximum-capacity line. Its tool interpolates manufacturer data at 47°F, 17°F and 5°F, with an optional lower-temperature point. Nominal capacity at a mild rating condition does not establish that intersection.
Plot capacity and load in the same units and at the same outdoor temperatures. Maintain the selected indoor condition and identify the matched equipment combination. For a variable-capacity system, using its minimum output curve would answer a cycling question instead of the backup-capacity question addressed here.
Interpolate a crossover between published points
At 17°F, take building demand of 32,000 Btu/h and heat-pump output of 28,000 Btu/h: the shortfall is 4,000 Btu/h. At 27°F, demand is 24,000 Btu/h and output is 30,000 Btu/h: the surplus is 6,000 Btu/h. Linear interpolation places the crossing 4 / (4 + 6) of the way through that 10°F interval, at 21°F.
That calculation identifies where supplemental capacity begins to be needed under the plotted conditions. It does not establish a compressor shutdown command. NEEP's sizing tool assumes the heat pump continues operating below the capacity balance point while supplementary heat supplies the shortfall, unless a compressor lockout is entered.
Separate cold-weather capacity from control settings
ENERGY STAR's cold-climate criteria require heating capacity at 5°F to be at least 70% of the specified 47°F capacity. That is an equipment comparison, not a promise that the unit covers 70% or 100% of a particular building's load.
NEEP also identifies a minimum-capacity threshold where building demand falls below the unit's lowest sustained output and cycling becomes likely. Enlarging the heat pump to move the cold-weather crossing downward can raise this mild-weather mismatch. Review both ends of the capacity envelope.
On a heat-pump control record, give the calculated capacity crossing, economic changeover and programmed lockouts their own fields. Record the load and equipment curves used so a later envelope upgrade or equipment replacement triggers a fresh crossover calculation.
Distinctions
- Building balance temperature
- The outdoor condition where internal and solar gains offset building heat loss, leaving no space-heating demand.
- Economic changeover
- The temperature where competing heat sources have equal delivered-heat cost at the selected rates and efficiencies.
Frequently asked questions
Does every heat pump have the same balance point?
No. Envelope heat loss, ventilation, indoor setpoint and the selected equipment capacity curve move the intersection.
Is auxiliary heat below the balance point a fault?
Supplemental output is expected when the building load exceeds available heat-pump output. Compare the size of that shortfall with actual staging before diagnosing unnecessary resistance operation.