Field glossary · process
Auxiliary / emergency heat
An AUX indication identifies a backup-heating request, not proof that a heater is producing heat. Resideo's T6 Pro permits shared or independent AUX/E outputs, so automatic auxiliary demand and selected emergency operation can energize the same heater bank or different banks. Diagnose the installed arrangement by matching the AUX/E configuration to the heater diagram, then recording heater current and compressor status in each mode.
Backup heat on a heat pump; aux stages in automatically, emergency forces it and locks out the compressor
Does AUX use a different heater from emergency heat?
Resideo's T6 Pro wiring guide says most heat pumps share their strip heaters between auxiliary and emergency operation, so those installations do not use a separate E connection. Its TH6320U2008 also supports independently controlled AUX and E outputs for separate heater banks. A terminal marked E therefore identifies a control function, not proof that another heater exists.
Trace the thermostat configuration through the air-handler diagram to the installed heater kit. Record whether backup is electric resistance or a fuel-fired furnace and whether the outputs operate together or independently. The thermostat wiring guide establishes the terminal vocabulary; the heater diagram establishes which loads those terminals actually switch.
Translate outdoor lockouts into operating bands
Resideo's T6 Pro installation instructions, revision 33-00181EFS-19, give installer setting 355 a compressor-lockout range of 5°F to 60°F in 5°F increments on the TH6320U and TH6220U models with a wired outdoor sensor. Resideo gives setting 356 a backup-heat outdoor-lockout range of 5°F to 65°F in 5°F increments. Select these settings from the installed equipment's operating data and load calculation.
An electric-backup installation configured with compressor lockout at 20°F and backup lockout at 40°F has three useful test conditions: at 45°F the compressor carries a heating call without temperature-enabled backup; at 30°F both heat sources are eligible; at 10°F the compressor is locked out and backup carries the call. Eligibility does not itself request a heater stage: room-temperature demand and staging logic still determine the output.
Record the calculated capacity crossover from the heat-pump fundamentals guide separately from installer settings 355 and 356. The T6 menu calls 355 a compressor lockout/balance point, but entering a temperature does not establish the building's capacity crossover. Resideo's wiring guide excludes auxiliary outdoor lockout on the TH6210U, so record the full thermostat model with the setting.
Prove the call reaches the heater
A thermostat display establishes that its logic requested backup. A complete operating record connects that request to the control output, relay or sequencer operation, heater current, and delivered air temperature. This separates a missing command from a heater stage that receives the command but contributes no heat.
Resideo's T6 Pro instructions warn that the installer system test bypasses compressor protection and direct the installer to avoid rapid compressor cycling. Use the separate heat and emergency-heat test states to record which outputs operate; confirm outdoor-lockout behavior afterward in normal operation with the sensed outdoor temperature recorded. An output test and a normal staging test establish different parts of the sequence.
Distinctions
- Backup heat droop
- Resideo's T6 Pro uses setting 340 for backup droop and setting 356 for outdoor backup lockout. A 2°F droop selection changes the room-temperature staging criterion; it does not change the outdoor permission entered at 356.
Frequently asked questions
Will a new thermostat add emergency heat?
The thermostat must have compatible control outputs, but the equipment must also contain an installed and connected backup heat source. A menu option cannot add heater capacity.
What should I save after changing the backup settings?
Save the thermostat model, equipment type, AUX/E configuration, outdoor-sensor reading, lockout values, and observed outputs during each heating test. Those details make the result reproducible.
Sources checked
Also defined as
- Backup that supplements a working heat pump, versus backup that runs with the compressor locked out