ANVILFIELD Try FieldOS

Field glossary · property

SEER2 / HSPF2

SEER2 (seasonal energy efficiency ratio 2) and HSPF2 (heating seasonal performance factor 2) rate cooling and heating in Btu per watt-hour under DOE's Appendix M1. At 16 SEER2, 48 million Btu of seasonal cooling corresponds to 3,000 kWh on the rating basis. The federal minimum for covered ordinary split-system heat pumps manufactured from January 1, 2023 is 14.3 SEER2 and 7.5 HSPF2. Both ratings must meet their respective thresholds.

Season-long cooling and heating efficiency ratings under the current DOE test method

Used across 2 Anvilfield field guides, most in HVAC.
Updated

Which efficiency test applies in 2026?

DOE's 2025 test-procedure update incorporates AHRI Standard 210/240-2024 (I-P) into Appendix M1 for SEER2 and HSPF2. It also establishes Appendix M2 using AHRI 1600-2024 and the SCORE and SHORE metrics, with use tied to future efficiency standards based on those metrics. A newly published alternative method does not automatically replace the ratings on current equipment.

The equipment class comes first. Under 10 CFR 430.2, the consumer central-air-conditioner and heat-pump category is limited to single-phase, air-cooled equipment rated below 65,000 Btu/h, with specific exclusions. A three-phase commercial rooftop unit falls outside that category even when it serves the same kind of building. Put the certified indoor/outdoor combination identifier beside the ratings on a heat-pump schedule.

Turn Btu per watt-hour into annual kWh

DOE's rating regulations express both SEER2 and HSPF2 in Btu per watt-hour. Divide seasonal Btu by the applicable rating to obtain watt-hours, then divide by 1,000 for kWh. This is a seasonal energy calculation, so substituting the equipment's nameplate Btu/h capacity for the seasonal Btu load gives the wrong units.

A 48,000,000 Btu cooling season takes 3,000 kWh at 16 SEER2 or 2,400 kWh at 20 SEER2 on that rating basis. The difference is 600 kWh, a 20 percent reduction in electricity despite a 25 percent increase in the efficiency number. This arithmetic compares an equal cooling load; the equipment's instantaneous Btu/h capacity is a separate quantity.

For heating, 60,000,000 Btu divided by 8 HSPF2 gives 7,500 kWh on the rating basis. DOE's represented heating calculation uses Region IV. Local temperature distribution, controls, and supplemental heat operation determine how a building's measured heating electricity differs from that seasonal test calculation.

The national heat-pump minimum is a pair of ratings

The 2026 edition of 10 CFR 430.32(c)(5) sets the following minimum pairs for covered consumer heat pumps manufactured on or after January 1, 2023. Select the product class before comparing a submittal; a space-constrained unit and an ordinary split system use different rows.

DOE separately applies regional requirements to central air conditioners. Keep the heat-pump product class distinct from the air-conditioner regional table when checking a schedule. A cooling rating alone leaves the heating criterion unanswered, even when both numbers appear together in the same product brochure.

Covered heat-pump product classMinimum SEER2Minimum HSPF2
Split system14.37.5
Single package13.46.7
Small-duct high-velocity12.06.1
Space-constrained11.96.3

Why the higher-static test has product-class exceptions

DOE's January 2025 final rule describes 0.5 in. w.c. as the conventional blower-coil system's minimum external static test pressure and adopts separate low-static single-split provisions. For that low-static class, the procedure adjusts airflow to achieve at least 0.1 in. w.c. when necessary. These are laboratory test conditions; the equipment's installation airflow and fan data govern field setup.

Confirm whether a proposed mini-split combination is ducted, low-static, or non-ducted before comparing test assumptions. That class distinction is one reason a generic percentage conversion from SEER to SEER2 cannot establish a model's certified result.

Distinctions

EER2
EER2 describes cooling efficiency at a specified rating condition. SEER2 combines seasonal conditions and operating behavior. An EER2 requirement remains a separate check where DOE's regional standards specify it.

Frequently asked questions

Which climate does the federal HSPF2 representation use?

DOE's representation rule specifies Region IV for HSPF2. A rating calculated for another heating region needs its region label retained; it is not the same basis as the nationally represented Region IV number.

Sources checked

Also defined as

  • Current cooling and heating efficiency ratings for the equipment

Where this shows up

Next step: Track heat-pump retrofit bids

Back to the full field glossary