ANVILFIELD Try FieldOS

Field glossary · measurement

Setpoint

A setpoint's position in the switching band depends on the controller's logic. With Honeywell's T775 heating relay set to 72°F and a 2°F differential, heat starts at 70°F and stops at 72°F; cooling starts at 74°F and stops at 72°F. The same display number therefore produces different thresholds by mode. Record the effective setting, sensor location and output transitions before changing the value to correct an apparent temperature error.

The outlet temperature the valve is field-adjusted to hold under varying inlet conditions

Used across 2 Anvilfield field guides, most in Plumbing.
Updated

Find out which edge of the cycle the number means

Honeywell's T775 Series 2000 application guide places the heating relay's off point at the setpoint and its on point at the setpoint minus the differential. With a 72°F setting and a 2°F differential, that logic energizes at 70°F and de-energizes at 72°F. It does not create a 71 to 73°F band.

For cooling, Honeywell's T775 logic de-energizes at the setpoint and energizes at the setpoint plus the differential. The same 72°F setting and 2°F differential therefore produces a 72 to 74°F cooling band. These examples describe that controller's relay logic; another controller can define its displayed setting differently.

Read the control sequence before changing a number to correct cycling. An output that starts exactly at its specified threshold is responding correctly even when the person watching the display expected a centered band. Write the switching thresholds into the thermostat commissioning record beside the displayed setting.

Trace the value from schedule to sensor

A building controller can have an occupied setting, an unoccupied setting and a reset schedule calculated from outdoor conditions. Record the effective setpoint at the time of the observation, not just the editable default. An override, network command or schedule transition can explain why the controller is using a different value.

Sensor location determines the controlled quantity. A supply-air setpoint controls the air at its sensor, not the room temperature. Likewise, mixed-water temperature at a valve and temperature at a distant outlet differ when recirculation, branch cooling or simultaneous draws affect delivery.

Trend the effective setpoint, sensed value and output together. A sensor offset shifts the apparent error; a lagging process shifts the timing; a closed actuator or failed relay prevents the commanded output from changing the process. Adjusting the setpoint alone obscures those differences.

Verify the delivered temperature after adjustment

Watts gives the LFMMV-M1 mixing valve an adjustable field range of 80 to 120°F and states that the valve is not factory preset. The same instructions require an outlet check and limit-stop reset to a maximum of 105°F after maintenance. Watts also recommends that maximum for shower and bathing fixtures; the valve's adjustment range is not the selected delivery temperature.

ASSE International lists ASSE 1017-2023 for hot-water distribution mixing and the joint ASSE 1070-2020 standard, reaffirmed in 2025, for fixture temperature limiting. Watts' LFMMV instructions show a distribution application with a separate ASSE 1069 or 1070 device at the fixture. Central mixed-water control and the fixture's limiting function therefore need separate locations on the control drawing.

Watts' LFMMV instructions call for at least two minutes of flow to stabilize supply temperature before calibrating the mixed outlet with a thermometer. A reading taken immediately after opening a cooled branch measures the branch's initial condition rather than the established mixed supply.

Document the final delivered temperature with the flow condition and the valve's limit-stop position. That record links the mixing valve's delivery-temperature function to an adjustment the next technician can reproduce.

Distinctions

Differential
The separation between relay switching thresholds. Its position relative to the setpoint depends on the controller’s logic.
Deadband
A range in which specified outputs remain inactive, often used to separate heating and cooling demands.

Frequently asked questions

Why does the equipment stop before the room reaches the displayed setting?

The display and controlling sensor may measure different locations, or the controller may use anticipation, staging or another sequence. Compare the active control mode and sensor value with the output command before moving the setting.

Sources checked

Also defined as

  • HVAC: The temperature the thermostat is told to hold

Where this shows up

Next step: Map rooftop controls accounts

Back to the full field glossary