Field glossary · process
Condensing
On a condensing gas boiler, log inlet temperature after any bypass mixing to count the hours available for latent-heat recovery. In GSA's six-building study, only three sites logged more than 30% of operation below the study's 130°F return-water threshold. A distribution-return sensor upstream of a hot bypass can overstate that opportunity. Use the mixed inlet temperature and firing history to judge how much of the installed condensing capability the system actually uses.
Cooling the flue gas below its dew point so water vapor condenses and gives up latent heat, the source of high efficiency
Compare rated efficiency with measured boiler operation
GSA's June 2014 findings used a below-130°F return-water criterion to count condensing operation at six facilities; only three exceeded 30% of operating time on that basis. Record the threshold and denominator with any similar percentage. Hours below a selected temperature and the amount of fuel burned during those hours answer different questions.
The same GSA findings reported Denver Federal Center measured efficiencies of 88 to 90% against a 98% rated figure. GSA reported 94% measured efficiency against 95% rated at the Atlanta facility. Retain the rating basis beside the field measurement, then use entering-water temperature and firing history to explain the installation's operating result.
Measure return temperature after the mixing point
Caleffi's Fall 2024 idronics 35 describes improving existing hydronic systems by lowering water temperatures and relates condensing-boiler efficiency to inlet temperature. A system return sensor upstream of a hot bypass does not measure the boiler inlet after mixing. Locate or identify the sensor used for the boiler's actual entering-water temperature.
When boiler flow exceeds distribution flow, a primary-secondary connection or hydraulic separator can return some hot supply directly to the boiler. Put both flow rates and all junction temperatures on the boiler selection and operating record. The bypass fraction then explains how much the measured distribution return understates actual inlet temperature.
Count operating exposure before forecasting savings
Bin the boiler's entering-water temperatures by operating hours and retain firing rate beside each interval. Time in a cool-return bin measures opportunity for condensation, while fuel use weights the seasonal energy result. A lightly firing boiler's long run and a heavily firing boiler's short run cannot be treated as equal fuel consumption merely because both belong to the same temperature bin.
Distinctions
- Refrigerant condensing
- A refrigeration condenser changes refrigerant vapor into liquid. That phase change does not identify a gas appliance designed to recover latent heat from combustion products.
Field example
A boiler receives 100 gpm: 75 gpm of distribution return at 110°F and 25 gpm of bypass supply at 170°F. For the same water properties, the mixed inlet is (75 x 110 + 25 x 170) / 100 = 125°F. Raising the bypass to 40 gpm with 60 gpm of return produces 134°F, crossing GSA's stated assessment threshold.
Frequently asked questions
Does a return sensor reading 110°F prove the boiler is condensing?
Identify where that sensor sits. The boiler may receive a warmer mixture after bypass or separator mixing, so trend its actual inlet together with firing condition.
Sources checked
Also defined as
- Plumbing: A gas heater that condenses the flue gas to capture latent heat, vented in plastic with acidic condensate
- Cooling flue gas below its dew point to recover latent heat; needs return water below roughly 130 to 140 degrees F