Field glossary · measurement
MBH
A schedule value of 250 MBH means 250,000 Btu/h, or 0.250 MMBtu/h; the column heading determines whether that rate is fuel input or usable heating output. Weil-McLain's model 488, for example, lists 1,010 MBH gas input but 629 MBH net steam capacity. Carry the rating basis with the number when comparing boilers, sizing fuel supply or checking the connected radiation.
Thousands of Btu per hour, the common hot water and small boiler output unit
Read the column heading before the capacity
Weil-McLain's Series 88 manual lists model 488 at 1,010 MBH gas input, 839 MBH gross steam output and 629 MBH net steam rating. These describe three capacities of the same boiler. Fuel-pipe and burner calculations start with input; connected-radiation calculations use the net steam rating.
The gross-to-input ratio for those published gas and steam ratings is 839 / 1,010 = 83.1%. That arithmetic is not a seasonal fuel-use prediction. Keep the manufacturer's named efficiency rating separate from a ratio calculated from capacity columns. When comparing boiler selections, keep steam output, water output and the named efficiency metric in separate columns.
Net ratings already carry a piping allowance
Weil-McLain bases the Series 88 net water ratings on a piping and pickup factor of 1.15. Its published net ratings already account for normal piping and pickup. Subtracting another routine pickup allowance from a listed net rating would count the same allowance twice.
The same manual uses a 1.333 steam pickup factor for models 488 and 588: 839 MBH gross steam output divided by 1.333 gives approximately 629 MBH net. Larger models use different steam factors. A water pickup factor does not transfer to the steam column. Preserve the fuel, model, rating column and connected system type alongside the MBH value.
MBH, MMBtu/h and the boiler program boundary
AHRI's Residential Boilers certification program covers gas- and oil-fired steam and hot-water boilers with inputs below 300 MBh. This is an input threshold for that certification program, not a rule that a boiler installed in a house must be smaller than that number. The program scope is another reason to distinguish input from output.
Write 250 MBH as 250,000 Btu/h or 0.250 MMBtu/h. MMBtu/h denotes millions of Btu per hour; MBH denotes thousands. A fuel meter total in Btu or MMBtu is energy accumulated over time, while a boiler's MBH rating is a rate. For a gas unit heater, retain both burner input for the gas load and heat output for the room load.
Capacity conversions for an equipment schedule
These conversions change units only; they preserve whichever input or output basis the schedule names.
| MBH | Btu/h | MMBtu/h |
|---|---|---|
| 24 | 24,000 | 0.024 |
| 100 | 100,000 | 0.100 |
| 250 | 250,000 | 0.250 |
| 1,000 | 1,000,000 | 1.000 |
Distinctions
- MBtu
- This shortened energy notation is ambiguous across industries. Spell out thousand or million and retain the per-hour denominator for a capacity.
- AFUE
- AFUE rates seasonal fuel utilization. It is not the label for every ratio formed from input and output columns.
Frequently asked questions
Is 100 MBH the same as 100,000 Btu?
It is 100,000 Btu per hour. The hour matters: a 100 MBH input operating for two hours consumes 200,000 Btu of fuel energy at that rate.
Which MBH number belongs in a gas load calculation?
Use appliance input. Output omits the appliance losses and therefore understates the fuel rate the piping must supply.
Sources checked
Also defined as
- Thousands of BTU per hour, the common rating unit for unit heater capacity