ANVILFIELD Try FieldOS

Field glossary · method

Outdoor reset

Outdoor reset turns a heating curve into a water-temperature target: a straight line through 180°F water at 0°F outdoors and 100°F water at 60°F outdoors calls for 140°F water at 30°F outdoors. Compare that calculated target with the controller display before judging the burner response. Emitter defaults, minimum-temperature settings and switching differential can each explain why actual boiler temperature differs from the simple line.

Control that lowers the supply water temperature as outdoor temperature rises, so the floor runs steady

Used across 2 Anvilfield field guides, most in HVAC.
Updated

Calculate the target from two documented endpoints

Caleffi defines reset ratio as the water-temperature change divided by the corresponding outdoor-temperature change between design and no-load conditions. State both endpoint pairs before quoting a slope. A line requiring 180°F water at 0°F outdoors and 100°F water at 60°F outdoors has a reset ratio of 80/60, or 1.33.

At 30°F outdoors, that line targets 140°F water. If the measured supply is 160°F while the displayed target is 140°F, the discrepancy is downstream of the curve calculation. If the displayed target itself is 160°F, examine the programmed endpoints, offset and limits. A radiant circuit needs endpoint temperatures selected for its floor construction; the 180°F endpoint belongs to this calculation, not to a radiant-floor setting.

Outdoor temperatureTarget on this straight line
0°F180°F
30°F140°F
60°F100°F

Emitter defaults can impose an unexpected floor

The tekmar 256 installation manual loads 120°F design supply and no boiler minimum for its high-mass radiant selection, but 190°F design supply and a 140°F minimum for its fan-coil selection. Selecting the wrong terminal type changes both the curve and its operating floor. These are controller defaults, not the design temperatures for every installation.

The same tekmar manual distinguishes the target from boiler switching differential. A burner can remain on while water crosses the target because its switching band is intended to avoid rapid cycling. Compare the supply trend with both limits of that band before calling an overshoot a failed reset calculation. Record burner on/off temperatures as well as the reset target during the boiler functional test.

Prove the outdoor input and the active operating mode

Tekmar directs installation of the outdoor sensor on a wall representative of building heat load, generally a north wall, away from heat sources such as ventilation openings. The 256 manual also warns against upward-facing conduit entry that admits rain. A sun-warmed or vent-heated sensor raises the reported outdoor temperature and lowers the heating target.

Record outdoor input, active heat demand, target, measured supply and the limits in force. Test the curve with a space-heating demand present and warm-weather shutdown inactive. On controls with a domestic-water priority function, identify that mode separately before comparing a high boiler target with the space-heating curve.

Distinctions

Parallel shift
Moving the whole curve up or down changes all targets by an offset. Changing slope alters the cold-weather and mild-weather targets by different amounts.
Boiler minimum
A lower limit on the controlled boiler temperature. A mixed distribution circuit can have a separate reset target below that boiler limit.

Frequently asked questions

Why does reset stop lowering the water temperature?

Read the active minimum setting, emitter selection and operating mode. A programmed floor can hold the target above the calculated curve.

Should I change slope or offset for a comfort complaint?

A similar error in mild and cold weather points to offset. An error that grows as outdoor temperature falls points to slope or the design endpoint.

Sources checked

Where this shows up

Related guides

Next step: Locate heating control projects

Back to the full field glossary