Field glossary · property
Turndown
A 25:1 fuel-input turndown means a boiler can sustain firing at about 4 percent of its maximum input; useful heat output still depends on efficiency at that condition. Read the maximum and minimum on the same rating basis before calculating the ratio. For a plant, use the smallest combination the sequence actually permits. A steam valve’s flow span and its upstream-to-downstream pressure ratio are separate selection checks.
The ratio of maximum to minimum load a valve can control well, wider on pilot-operated valves
Calculate the minimum on the stated rating basis
Lochinvar’s 2024 CREST brochure gives the FBN2001 a maximum input of 1,999,999 Btu/h and a minimum of 80,000 Btu/h, approximately 25:1 turndown. The minimum is about 4 percent of maximum input. Lochinvar lists the FBN1251 at 20:1, demonstrating that the family’s maximum ratio does not apply to every model. Those are fuel-input ratings; useful heat delivered to the water is a separate rating.
A heating demand below that unit’s minimum sustained output still requires cycling, storage or another capacity arrangement. A high ratio does not eliminate the low-load boundary. Compare the building’s smallest sustained demand with the selected model’s minimum rate, rather than applying the product family’s largest advertised ratio to every size.
Steam pressure ratio is a separate selection check
Spirax Sarco’s Pressure Control Applications tutorial recommends 10:1 as a practical maximum pressure ratio for the self-acting reducing-valve arrangement it describes. That pressure-ratio guidance concerns the upstream and downstream pressures. Load turndown concerns maximum and minimum flow, so one ratio cannot establish the other.
On a station worksheet, keep inlet and outlet pressures in labeled psig or psia columns and put maximum and minimum steam demand in lb/h columns. A demand range of 2,000 to 100 lb/h requires a 20:1 flow span, regardless of how the pressure pair is reported. Confirm the selected valve’s pressure limits and installed low-flow behavior independently in the PRV station selection.
Distinguish one unit’s turndown from the plant’s
With four identical 500,000 Btu/h-input boilers, each capable of 10:1 modulation, full installed input is 2,000,000 Btu/h. One boiler at minimum uses 50,000 Btu/h, yielding a theoretical 40:1 installed-input span when the sequence can leave the other three off. Requiring all four to remain firing raises minimum input to 200,000 Btu/h and reduces the span to 10:1.
Match the selected boiler type to the combinations the controls actually permit at light load. Record minimum enabled units, minimum flow restrictions and any duty that holds a unit on.
Distinctions
- Rangeability
- Rangeability is the ratio of maximum to minimum controllable valve flow under stated test conditions. A flow characteristic describes how flow changes with valve travel. Spirax Sarco’s characteristic tutorial uses a 50:1 valve under constant differential pressure; that laboratory basis does not establish the usable flow span after installation.
Frequently asked questions
Does 25:1 turndown guarantee condensing operation?
No. Turndown describes modulation range. Condensation depends on the heat-exchanger conditions, particularly return-water temperature, as well as the equipment design.
Can two boilers have more plant turndown than one?
Yes, when the sequence lets one unit run alone at minimum. Use input ratings on both sides of an input-turndown calculation, or output ratings on both sides of an output calculation. Mixing a plant input maximum with a boiler output minimum creates a false ratio.
Sources checked
Also defined as
- The ratio of a boiler's maximum to minimum firing rate, such as 5 to 1