ANVILFIELD Try FieldOS

Field glossary · measurement

Droop

Droop is a steady load-dependent reduction in a regulator's controlled value at an unchanged setting. For a generator governor it links speed reference to loading; for a pressure regulator it links downstream pressure to flow. Woodward describes typical governor droop of 3 to 5 percent across full output travel. Record the percentage base and travel used: a transient frequency dip and a steady droop setting describe different behavior.

Frequency or voltage falling with load, commonly 2 to 4 percent, which makes parallel sets share without a comms link

Used across 2 Anvilfield field guides, most in Electrical.
Updated

Calculate governor droop from the reference curve

Woodward Application Note 01302 describes a usual governor reference reduction of 3 to 5 percent across the full governor output travel. Its 3 percent example runs from 1,854 rpm at no fuel to 1,800 rpm at maximum fuel, corresponding to 61.8 and 60 Hz. That example uses the rated full-load speed as the percentage base: (1,854 - 1,800) / 1,800 x 100 = 3 percent.

Label the denominator in a test record. Dividing those same endpoints by 1,854 gives 2.91 percent, so two spreadsheets can disagree without either tachometer being wrong. Record the controller's definition, unloaded and loaded reference values, load percentage, and governor travel used. The generator synchronization guide covers connection to the bus; these measurements establish the slope behind the sharing setting.

Why linkage travel changes the measured percentage

Woodward's note states that using only half the governor output travel halves the effective droop. Its example changes a nominal 3 percent characteristic into a 1,827-to-1,800 rpm range, or 1.5 percent on the same base. A linkage change can therefore alter sharing even when nobody has moved the droop adjustment.

On a strong utility bus the system holds the running frequency. Read the governor reference and exported kW together rather than expecting the generator's frequency to fall independently. A raised reference increases its load at the common frequency. This is the operating condition that makes a reference-curve measurement different from a simple frequency trend.

Voltage droop and regulator pressure use different curves

DEIF application note 4189340670J specifies 3 to 4 percent AVR voltage droop with the DEIF controller not in control and calls for matching the droop between paralleled units. Keep voltage versus reactive load separate from speed reference versus real load; a shared percentage does not make the two adjustments interchangeable.

Spirax Sarco's SRV461/463 technical sheet bases its capacities on 20 percent pressure offset and recommends using 80 percent of the fully open capacity indices for sizing. Those model-specific values are a better selection basis than transplanting a generator's droop percentage to a steam reducing station. Pressure, flow, spring range, and the pressure at which the setting was made belong on that curve.

Distinctions

Hunting
Hunting is repeated oscillation. Droop is a steady load-dependent slope, even when the controlled value settles cleanly.

Frequently asked questions

Is a sudden 2 Hz dip a droop measurement?

Only stabilized endpoints at an unchanged reference establish droop. Log the initial dip, recovery time, and final value separately so a slow transient is not mistaken for a changed steady slope.

Sources checked

Also defined as

  • HVAC: The amount a valve's downstream pressure sags below setpoint as load rises, worst on direct-acting valves

Where this shows up

Next step: Map generator service sites

Back to the full field glossary