Excess air

Excess-air percentage measures the surplus above theoretical combustion air; lambda measures the total supplied air divided by theoretical air. Thus lambda 1.15 means 15% excess air. Flue oxygen is a separate measured quantity: DOE's natural-gas table pairs 2% oxygen with 9.5% excess air. Keep fuel selection and sampling location with the analyzer result because a different fuel basis or downstream dilution changes the interpretation.

Combustion air beyond the stoichiometric minimum; commonly around 15 percent (about 3 percent flue O2) on a tuned gas burner

Used across 2 Anvilfield field guides, most in HVAC.
Updated

Read flue oxygen against the fuel-specific relationship

DOE's January 2012 Steam Tip Sheet 4 pairs 2% flue oxygen with 9.5% excess air and 5% oxygen with 28.1% excess air for natural gas. A three-percentage-point oxygen change therefore corresponds to 18.6 percentage points of excess air in that table. The conversion is fuel-specific and nonlinear.

Testo's combustion-measurement guidance distinguishes oxygen measurement from calculated fuel-air ratio and explains that the combustion relationship is fuel-specific. Preserve fuel selection, oxygen reading and the instrument's excess-air result in the record. Comparing only a calculated percentage can hide a changed fuel setting or calculation basis.

Use lambda without confusing surplus air with total air

Lambda equals actual combustion air divided by theoretical air. Excess-air percentage is 100 x (lambda - 1), so lambda 1.15 means 15% excess air, not 115% excess air. Testo's combustion chart places complete-reaction stoichiometry at lambda one and the excess-air region above it.

Add the sampling point and burner load to the combustion-analysis record beside oxygen, CO and temperature. Testo's guidance describes fresh-air dilution of a flue-gas sample; a higher measured oxygen fraction at that location need not mean more air passed through the flame. Compare visits at the same sampling point before attributing the change to burner adjustment.

Keep combustion efficiency separate from seasonal performance

DOE's tip sheet states that 10% excess air is attainable on well-designed natural-gas systems. That describes a system capability, not a setting for every gas appliance. Its efficiency relationship also depends on the flue-gas temperature above combustion-air temperature. A combustion-efficiency calculation does not include the building's cycling and distribution losses.

Distinctions

Combustion-air opening
An opening supplies air to the appliance area. Its dimensions do not measure the excess air actually passing through the burner or establish the flue oxygen result.

Field example

DOE's table gives 78.2% combustion efficiency at 7% oxygen and a 400°F flue-to-combustion-air temperature difference, versus 80.4% at 3% oxygen and the same difference. At equal useful output, the calculated fuel reduction is 1 - 78.2 / 80.4 = 2.74%. This compares table conditions; an operating target comes from the identified appliance instructions.

Frequently asked questions

Is three percent oxygen the same as three percent excess air?

No. DOE's natural-gas table maps 2% flue oxygen to 9.5% excess air and 5% oxygen to 28.1% excess air. One is a gas concentration, while the other compares air supplied with the fuel's theoretical demand.

Sources checked

Also defined as

  • The air supplied above what the fuel needs to burn completely; read from flue oxygen